三个月太极拳训练对中年人和老年人心率变异度、血脂肪以及内容摘要:
low frequency power • The spectral peaks ( Hz): total power Measurement (3) • The normalized highfrequency power ( highfrequency power / total power ) : vagal activity • The normalized lowfrequency power ( lowfrequency power / total power ) : sympathetic activity • The low /highfrequency power ratio : sympathovagal balance Measurement (4) • Biochemistry assays: total cholesterol (TC), HDLcholesterol (HDLC), low density lipoproteincholesterol (LDLC), triglyceride (TG), fasting blood sugar (FBS), uric acid (UA) • Immunoenzymometric assays: tumor necrosis factorα (TNFα), Interferonγ (INFγ) Statistics (1) • Descriptive statistics: median (25% —75%). • The MannWhitney rank sum test . • The Wilcoxon signed rank test. • p was considered statistically significant. Statistics (2) • The percentage change were calculated by using the following formula: • =[(after before )(before )]100 Results • Table 1. General characteristics, spirometry and hemodynamics of controls and TCC trainees before and after TCC training • Characteristics Controls Controls TCC Trainees TCC Trainees • (Before 3 months) (After 3 months) (Before training) (After training) • (n = 25) (n = 25) (n = 25) (n = 25) • Age (years) 53 (47~59) 53 (47~59) 57 (50~67) 57 (50~67) • Gender (M/F) 12/13 12/13 8/17 8/17 • Body weight (Kg) 61 (53~62) 61 (55~63) 56 (52~63) 56 (52~63) • Body height (cm) 162 (158~163) 162 (158~163) 156 (153~164) 156 (153~164) • BMI (kg/m2) (~) (~) (~) (~) • FVC (l) (~) (~) (~) (~) • %FVC (%) (~) (~) (~) (~) • FEV1 (l) (~) (~) (~) (~) • %FEV (%) (~) (~) (~) (~) • FEV1/ FVC (%) (~) (~) (~) (~)* • SBP (mmHg) 119 (107~128) 120 (113~137) 126 (112~131) 120 (109~133) • DBP (mmHg) 67 (61~74) 67 (63~72) 67 (64~69) 67 (60~72) • MABP (mmHg) 83 (77~92) 85 (80~92) 85 (82~92) 82 (78~92) • PP (mmHg) 48 (42~56) 53 (43~65) 55 (49~65) 51 (44~64) • Data are presented as medians (25 percentile~75 percentile) • * p vs. before TCC training in TCC trainees. • BMI = body mass index。 FVC = forced vital capacity。 FEV1 = forced expiratory volume in the first second。 l = liter。 SBP = systolic blood pressure。 DBP = diastolic blood pressure。 MABP = mean arterial blood pressure。 PP = pulse pressure. • Table 2. HRV measures of the controls and TCC trainees before and after TCC training • Measures Controls Controls TCC Trainees TCC Trainees • (Before 3 Months) (After 3 Months) (Before Training) (After Training) • (n = 25) (n = 25) (n = 25) (n = 25) • Time domain HRV measures • Mean RRI (ms) 884 (781~938) 892 (791~956) 921 (826~1027) 891 (801~957) • Heart rate (bpm) 67 (63~75) 68 (65~76) 65 (58~73) 67 (63~75) • SDRR (ms) 48 (37~52) 43 (36~50) 41 (28~55) 34 (24~50) • CVRR (%) (~) (~) (~) (~) • Frequency domain HRV measures • TP (ms2) 993 (634~1176) 823 (583~1202) 681 (371~1312) 508 (215~1455) • VLFP (ms2) 163 (115~363) 195 (97~359) 215 (140~300) 148 (77~355) • LFP (ms2) 268 (167~318) 258 (148~37。三个月太极拳训练对中年人和老年人心率变异度、血脂肪以及
本资源仅提供20页预览,下载后可查看全文
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。
相关推荐
三亚市第三中学简秀锦
、 U盘、存储卡等 运算器、控制器合成 中央处理器 ,英文缩写名称是 CPU,它的作用就像人的大脑,它是计算机的运算控制中心。 中央处理器( CPU) CPU即 Central Processing Unit (中央处理器) 的简称,它是计算机的心脏,是计算机中最重要的组件,它决定计算机的基本性能。 二、 主机的 硬件组成 C CPU(正面 ) CPU(反面 ) 内存条 主板 CPU风扇
三个阶段:ⅰ20世纪50年代外交原则的确立及其走向成熟ⅱ
恩来提出 “ 求同存异 ” 的方针,推动会议圆满成功。 4)成果: 通过了 《 关于促进世界和平和合作宣言 》 ,形成 “ 万隆精神 ” (亚非人民团结一致,反对殖民主义,民族独立,友好合作的精神)。 异: 意识形态和社会制度不同 同: ①都曾经遭受过殖民主义 的侵略 ②都要维护民族独立、发展经济 ③都有维护和平的共同愿望 5)意义: 加强了同亚非国家的联系;开拓了中国外交新局面。
三、打破隔离的坚冰19世纪末20世纪初
24岁那年发表了他的第一篇作品。 《母亲》插图 亚非拉文学 ( 1)印度: 泰戈尔 《 古檀迦利 》 《 新月集 》《 飞鸟集 》 ( 2)日本:川端康成 《 雪国 》《 千纸鹤 》 《 伊豆的舞女 》 ( 3)中国: 鲁迅 《 狂人日记 》 《 阿 Q正传 》 泰戈尔 ( 1861—1941)是印度现代伟大的诗人、小说家和戏剧家。 多才多艺,才华超人。 1861年