timbolesdatabaseadministratorseniorstaff内容摘要:

• Data Retention Times • Acceptable Mean Time To Recovery (MTTR) 22 Beyond the Basics • Encryption – Storage of Encryption Keys – Access to Encryption Keys • Design of Database – ReadOnly Tablespaces – Tablespace Partitions • Compression Algorithms 23 Is Your Backup Good? • Backup Log • Physical Check • Logical Check • Only good if you can recover 24 HOW TO BE SURE YOU CAN RECOVER 25 What Is Your Source? • Memory / Experience • Oracle Documentation / Books • Inter Search Engines • Coworker • Monitoring Tools (. Oracle Enterprise Manager) • Customized Documentation 26 Are You A Single Point Of Failure? 27 BACKUP AND RECOVERY DOCUMENT 28 Documentation Is Your Friend • Good Business Sense • Every System Is Different – Boosts Ability to Concentrate • Gain Experience and Knowledge • Refine Backup / Restore Policies • Refine Procedures 29 Bamp。 R Document 20200 ft View • Overall Backup Strategy • Architecture Summary • Script Listing and Description • Procedures • Test Documentation 30 Overall Backup Strategy • Types of Backups And Reasons – Physical • Hot / Cold • Full / Incremental – Exports • Full • Schema, Table, (Transportable) Tablespace • Tools • Scheduling • Notification • Retention Policies (Time and Offsite Location) • System Specifics 31 Architecture Summary • Server Configuration • Tool Integration • Database Configuration 32 Tools and Technology Available • Media Failure – Restore Media from Backup – Recover using RMAN or SQL Commands • Full • Partial – Tablespace pointintime。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。