howtoconductdecentresearchwork内容摘要:
ommunication to Editors • Acknowledge editorial work • Address exactly the questions raised by reviewers • Rebuttal with sound evidences 两脚踏东西文化 一心评宇宙文章 17 What Gets You Accepted? • Attention to details • Check and double check your work • Consider the reviews • English must be as good as possible • Presentation is important • Take your time with revision • Acknowledge those who have helped you • New, original and previously unpublished • Critically evaluate your own manuscript • Ethical rules must be obeyed – Nigel John Cook, EditorinChief, Ore Geology Reviews 两脚踏东西文化 一心评宇宙文章 18 Suggestions for Students • Lab records (experiment results) • Literature reviewing (introduction amp。 discussion) • Talk to supervisor (bring copied articles amp。 data) • Discussion with other faculty/fellow students • Write down anything of interest – Try to do one paper in one month! – This can be done and we have done and can do that in a regular base (once for each student). – Everything should be made as simple as possible, but not simpler. – Albert Einstein 两脚踏东西文化 一心评宇宙文章 19 Samuel Johnson (17091784) • Your manuscript is both good and original, but the part that is good is not original and the part that is original is not good. • What is written without effort is in general read without pleasure. • Knowledge is of two kinds. We know a subject ourselves, or we know where we can find information on it. • Curiosity is one of the permanent and certain characteristics of a vigorous mind. • Great English author, critic, amp。 lexicographer。 wrote Dictionary of the English Language 17471755, novel Rasselas 1759, 10volume Lives of the Poets 17791781. Next only to William Shakespeare. 两脚踏东西文化 一心评宇宙文章 20 Good References • Chicago Guides to Writing, Editing, and Publishing • The Chicago Manual of Style, 15th Edition: CDROM for Windows (CDROM), Ju。howtoconductdecentresearchwork
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。