bookfivelessonsix内容摘要:
2020/03/12 11 克漏字 (一 ) ( ) 6. (A) to (B) in (C) at (D) on ( ) 7. (A) admirations (B) adhesives (C) adventures (D) advantages ( ) 8. (A) by (B) for (C) from (D) into ( ) 9. (A) ultimately (B) nearly (C) equally (D) continually ( )10. (A) save (B) ruin (C) face (D) escape 解答 : 2020/03/12 12 克漏字 (二 ) Mr. Wang once went on a business trip in a city he had never been before. On the way, Mr. Wang saw two roads __1__ in the front. He wished he __2__ both, but he couldn39。 t. He sat in his car, __3__down one road as __4__ as he could, to where the end of the road could no longer be seen. Then he looked at __5__, on which some cars were running. It looked like the second road was the right way to go. But, he asked himself __6__ a sigh, Which road should I take? Without anyone to ask for __7__ from, Mr. Wang decided to __8__ the map he had. __9__ the help of the map, Mr. Wang learned that the first road could take him to his destination. To Mr. Wang, the map really made a great __10__ to his decision. 2020/03/12 13 克漏字 (二 ) ( ) 1. (A) diverge (B) claim (C) doubt (D) step ( ) 2. (A) were traveling (B) had traveled (C) could have traveled (D) would be traveled ( ) 3. (A) and looking (B) to looked (C) looked (D) looking ( ) 4. (A) tall (B) far (C) wide (D) soon ( ) 5. (A) some (B) other (C) the other (D) another 2020/03/12 14 克漏字 (二 ) ( ) 6. (A) with (B) through (C) from (D) by ( ) 7. (A) language (B) wear (C) reason (D) advice ( ) 8. (A) plain (B) confirm (C) consult (D) fort ( ) 9. (A) With。bookfivelessonsix
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。