auditoryandvestibularsystemskey内容摘要:
ner’s membrane, basilar membrane, an of Corti Note changes in width of basilar membrane The an of Corti Cochlear duct contains endolymph: high K+, low Na+ Relations between the middle and inner ear Changes in the width of the basilar membrane – vibration and frequency response Shearing forces in the an of Corti – mechanical deformation and signal transduction Ascending (central) auditory pathways Tonotopicity, lesions。auditoryandvestibularsystemskey
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。