vp纯化水系统验证方案内容摘要:
onsult pipe material certificate document and attach it in attachment16./检查材质证明并附于附件 16 Installation requirement/ 安装要求 Using hotmelttype welding joint connecting the healthquick, circular layout, smooth, no dead ends。 each water point of use of diaphragm valves, the water intake point and the outlet layout drawings based on design requirements./采用热熔式氩弧焊与卫生快装接头连接,循环布置,光滑、无死角;每个用水点采用隔膜阀,各取水点及出水口的布置依据图纸设计要求。 Inspection by Visual and check the relative records./目测及检查相关记录 purified water tank installation (A total of 1, water storage capacity of 1m3)/纯化水储罐安装确认 (一只,贮水量 为 1m3) Method: Inspection by Visual, Measured with vernier caliper and Consult material certificate document and attach it in attachment16, records fill in attachment 17. 确认方法:目测、游标卡尺测量、检查材质 证明 (附于附件 16),确认记录填写于附件 17。 Standards/合格标准: ( 1) Tank inside and outside surface is polished, smooth surface./储罐内外表面经过抛光,表面光洁。 ( 2) Inside surface and sealed head: Material SS304 stainless steel, thickness 4mm/内筒体及封头:材质 SS304 不锈钢,厚度 4mm。 ( 3) Connectors and related auxiliary equipment/连接口及相关配套设备: ① Purified water Inlet(top)/ 纯化水入口 (顶部 ): DN15 ② Purified water Outlet(bottom)/纯化水出口 (底部 ): DN20 ③ Limber hole(bottom of the lowest)/排污口(底部最低位置): DN15 ④ Clean hole (at the top of the middle position): DN32 With 3600 rotary cleaning ball, material SS304./清洗口 (顶部正中位置 ): DN32,配 3600旋转清洗球,材质 SS304 不锈钢。 ⑤ Breath hole (top)/呼吸 口 (顶部 ): DN15 purified water storage tank SCBA installation/纯化水储罐空气呼吸器安装确认 . The record fill in attachment 18./确认记录填写于附件 18。 Item/项目 Standard/合格标准 Method/确认方法 Purified Water System Validation Protocol 纯化水系统验证方案 Document Revision 00 Date 日期 20200301 Company Name 公司名称 Page 页码 Page 9 of 39 Body material/壳体材质 SS304 Consult material certificate document and attach it in attachment16./检查材质证明并附于附件 16 Filter material/过滤材质 Polypropylene/聚丙烯 Consult material certificate document and attach it in attachment16./检查材质证明并附于附件 16 Seal method/密封方法 Melt together/热熔合 Consult certificate document and attach it in attachment16./检查证明并附于附件 16 Hole Diameter/孔径 m Consult certificate document and attach it in attachment16./检查证明并附于附件 16 Critical parts material qualification./关键部位材质确认 . The records fill in attachment19./确认记录填写于附件 19。 Parts name/部件 Requirement/要求 Method/确认方法 Body material/壳体材质 Media and requirements/介质及要求 Original water pump/原水泵 Stainless steel/不锈钢 / Consult material certificate document and attach it in attachment16./检查材质证明并附于附件 16 Multimedia filter/多介质 过滤器 FRP Quartz sand, anthracite/石英砂、无烟煤 Consult material certificate document and attach it in attachment16./检查材质证明并附于附件 16 Activated carbon filters/活性炭过滤器 FRP Activated carbon/活性炭 Consult material certificate document and attach it in attachment16./检查材质证明并附于附件 16 Security filters/保安 滤器 Stainless steel/不锈钢 Polyethylene fiber/聚乙烯纤维 Consult material certificate document and attach it in attachment16./检查材质证明并附于附件 16 Highpressure pump/高压泵 Stainless steel/不锈钢 / Consult material certificate document and attach it in attachment16./检查材质证明并附于附件 16 Cleaning Pumps/清洗泵 Stainless steel/不锈钢 / Consult material certificate document and attach it in attachment16./检查材质证明并附于附件 16 Purified Water System Validation Protocol 纯化水系统验证方案 Document Revision 00 Date 日期 20200301 Company Name 公司名称 Page 页码 Page 10 of 39 reverse osmosis system element/一、二级反渗透元件 Stainless steel/不锈钢 TFC Consult material certificate document and attach it in attachment16./检查材质证明并附于附件 16 UV sterilizers/紫外线杀菌器 Stainless steel/不锈钢 / Consult material certificate document and attach it in attachment16./检查材质证明并附于附件 16 Microporous filter (the number is 2)/微孔过滤器(2 个 ) Stainless steel/不锈钢 nylon filt er / m 尼龙液体过滤芯 Consult material certificate document and attach it in attachment16./检查材质证明并附于附件 16 Terminal pump/ 终端水泵 Stainless steel/不锈钢 / Consult material certificate document and attach it in attachment16./检查材质证明并附于附件 16 Pipeline pressure test, clean, passivation and disinfect qualification./管道分配系统的试压、清洗、钝化、消毒确认 Qualification method/确认方法 Inspect the pipeline pressure test record(attachment 5), clean record before use(attachment 6),pipeline passivation records(attachment 7) and pipeline disinfect records(attachment 8)./检查纯化水管路试压记录 (附件 5)、纯化水管道使用前清洗记录 (附件 6)、纯化水管道钝化记录 (附件 7)、纯化水管道使用前消毒记录 (附件 8) Standards/合格标准 ( 1) Pipeline pressure test/管路试压: Pressure test with Water, experimental pressure is which is times working pressure ()。 the pipeline should be no leakage under the pressure./用水试压,实验压力为工作压力( )的 倍即 ,整个管路在实验压力下应无渗漏发生。 ( 2) Pipeline clean, passivation and disinfect/管道清洗、钝化、消毒 ① Purified water cycle pipeline Prewashed: The purified water tank, pump and pipeline to connect into a cycle path, add sufficient amount of purified water to purified tank, open the pump to cycle for 15 minutes, open the drain valve, and then continue cycle./纯化水循环预冲洗:将 纯水罐 、水泵与管路连接成一个循环通路,在 纯水罐 中注入足够量的纯化水,开启水泵进行循环,循环 15 分钟后,打开排水阀,边循环边排放。 ② Alkaline Cleaning: The sodium hydroxide (chemically pure and above) with hot water Purified Water System Validation Protocol 纯化水系统验证方案 Document Revision 00 Date 日期 20200301 Company Name 公司名称 Page 页码 Page 11 of 39 (temperature 90 ℃ or above) preparation of 1% (w / v) solution (500L), with the circulation pump more than 30 minutes (after 30 minutes opening Each water point of the valve for 10 seconds to wash their), open the drain valve, discharge lye./ 碱液清洗:将氢氧化钠(化学纯以上)用热水(温度 90℃以上)配制成 1%( w/v)的溶液(500L),用水泵循环 30 分钟以上(期间隔 30 分钟 后 开启每个用水点阀门 10 秒钟对其进行清洗),打开排水阀,排放碱液。 ③ Rinse: Add purified water to purified water storage tank, star。vp纯化水系统验证方案
相关推荐
.............................. 错误 !未定义书签。 冲模的安装 ....................................................................................................................... 20 第七 章 设计体会 ..................
................................................................................... 48 7. 分配机会 ........................................................................................................
!您目前校园 WLAN业务状态为未开通,可能是因为您未开通校园 WLAN业务,请先开通再继续使用。 2) 查询用户业务状态为欠费或暂停 客服解释口径建议: 尊敬的客户,您好 !您目前校园 WLAN业务状态为暂停,可能是因为您的手机话费不足或欠费,您在充值或缴费后,校园 WLAN业务可以正常使用。 3) 如果用户业务状态为开通,但用户名 /密码不正确 客服询问:您输入的用户名 /密码是否正确。
第五章 弯曲力的计算 与压力机的初选 弯曲力的计算 本产品属于 V形弯曲,由于弯曲虽然是一副模具所以在计算弯曲力时,需要计算 1次 , V 形弯曲的计算公式如下 6 ,弯曲力计算 F= /(R+t) (41) F= 8 1 600/( +1) =6864N = 式中 F—— 弯曲力( N); B—— 产品的弯曲的宽度( mm); δ —— 材料抗拉强度( MPa);( 550700 MPa)
经一度是桌面计算中的普遍主力,在多种情况下都实现了价格、性能与能力的最佳组合。 但对于许多使用条件来说,瘦客户机很难算是最理想的解决方案。 瘦客户机的部分缺点如下: 难于管理: PC 机硬件和用户分布广泛,而且用户在访问桌面环境时的位置无关性要求越 来越高。 在这种情况下,集中化的 PC 机管理极其困难。 而且 PC 机桌面的标准化难度可谓 “声名狼藉 ”,其中的原因就在于 PC 机硬件的多样化
/周的变更管理准 备和数小时的维护窗口。 4. 兼容性差 系统和应用迁移到新的硬件需要和旧系统兼容的系统。 为了更好的解决上述传统单一物理服务器部署应用方式 所造成 的弊端,全球虚拟化产品领先厂商 VMware 公司 与 PC 服务器领域的著名厂商 XXX公司通力合作,共同为用户推荐了如下的采用 VMware 虚拟架构软件的服务器虚拟架构解决方案,该方案将极大的提供服务器整合的效率