67m技术规格书内容摘要:
approval. The stability calculations also to be submitted to the Owner for approval. Trimand stability calculations to be supplied to Owner on diskettes in ASCIIformat. 对装上所有设备和装载时 ,最小初稳性高 GM应满足国家船检要求。 同样适用于装载时 GZ 特征曲线。 为了尽量满足标准 ,须做倾斜试验和稳性计算并提交国内船检审核 ,稳性计算还应提交船东审核 . 倾斜和稳性计算应以 ASCII 格式存于软盘交给船东。 MAIN GROUP 1 MODEL TEST DRAWINGS 模型试验 ,图纸 Table of contents MAIN GROUP MODEL TEST,DRAWINGS 模型试验 ,图纸 ............................................……......1 TABLE OF CONTENTS...目录 ................................................................................... 2 10 SPECIFICATION, MODEL TEST, DRAWNING 规格书 ,模型试验 ,图纸 ................. 3 101 Contract – and Specification work...合同和规格书 .................................. …...3 Project amp。 Drawing in general Model Test....模型试验方案,图纸 .................…...3 109 Instruction Material..........材料手册 ...................................................................3 127 Models……… 模型 ……………………………………………………………. 3 15 MEASUTEMENTS, TEST amp。 TRIALS…… 测试,航行试验 …………………….4 151 Test of Machinery …………………… 设备测试 …………………………….4 152 Tank capacity. inclination experiment…… 舱容,倾斜试验 .......................….4 153 Fuel and lub. oil for dock and trial test.........船台,自航试验的燃滑油 ..........4 154 Trial Hn...........…………………..............................................................……. 5 156 Testing of Electric Plant……… 供电系统测试 ……...........,....................……. 6 162 Guarantee work…………. 担保 ………………………………………………..6 10 SPECIFICATION MODEL TEST DRAWINGS 101 Contractand Specification work 合同和规格书 Project amp。 Drawing in generalModel Test 模型试验方案和图纸 Before the work starts, the arrangement and acmodation drawings to be supplied with as many details as possible and submitted to the Owner39。 s for approval. 工作开始之前 ,需把最详细的总布置图和舱室布置图提交船东认可 . The Yard shall base their price on the ponents of the equipment especially mentioned in the specification. Other equipment and ponents may be accepted on separate agreement to where this is found suitable. The Yard shall in such occasions give the price connection involved for alteration beforehand. Model test for same hull form is carried out. 船厂应根据规格书中提出的设备 ,部件报价 .如果合适的话 ,其余的设备 ,部件单独协商 .在需变更的情况下 ,船厂因事先给出相关价格 .本船必须进行模型试验 . 109 Instruction Material 设备使用说明手册 Instruction manuals in three copies for all machinery and equipment to be delivered. Manuals to be in English. 所有机械 ,设备的使用说明手册须一式三份 ,英语书写 . Yard shall also ensure that the ship’s crew have the necessary instructions on board for using the equipment fitted. 船厂应保证本船的船员 在使用设备时有详尽的使用说明 . 127 Model 船模 One ship model of the vessel to be delivered (scale 1:100). 本船应有一 1:100 的船模 . 15 MEASUREIENTS TESTS amp。 TRIALS 测试和试验 151 Test of Machinery 设备测试 Before trial test of the main engine at the factory, the Owner shall be called upon in due course. 在进行主机测试之前 ,必须正式通知船东 . Torsional vibration calculations to be carried out by the engine manufacturer and submitted to the Owner and the Class for approval. 主机厂商必须进行扭振计算 ,并提交船东 ,船级社认可 . Before the trial trip the main machinery to be tested at dock until the engine and propellers suppliers are satisfied with the preliminary adjustments. Instruments and alarm plant shall be tested. 航行试验前须进行主机 ,推进器的船台测试并须得到供应商对初调的认可 ,同时进行仪表和报警系统的测试 . The machinery to be tested at dock before the trial trip to the extent necessary to obtain a temporary service permission for the trial trip from Class and National Authorities. 自航试验之前 ,必须在船台进行足够 ,必须的试验以获得船级社和国家机构对自航试验性暂时服务的许可 . All machinery to be tested to the Owner’s, Class and subcontractors eventual satisfaction. 所有设备必须进行测试以满足船东 ,船级社和分包商的认可 . 152 Tank capacity, inclination experiment 舱容 ,倾斜试验 All tanks to be calculated and sounding Tables to be made. 所有舱室须计算舱容 ,做出舱容表 . Two conditions with trim forward. One for even keel condition and two for condition with trim aft. 有两种前面调整的情况。 一种是龙骨情况和另一种是调整后面。 The inclination experiment is described under general data Item L, previously. 倾斜试验参见 Item L 153 Fuel and lub oil for dock and trial test 船台和自航的燃滑油 Make of lub. Oil to be decided by the Owner in due course before delivery. 船东通过正式程序决定燃滑油的牌号 Owner to supply fuel oil lub. Oil and grease for initial filing of the systems. 系统初始的燃油 ,滑油 ,润滑油脂由船东提供 . The Builder shall pay the cod of the quantities of fuel oil lubricating oil and grease for initial fillup of equipment as well as consumed during tests and trials. 测试和航行试验中需要的燃滑油 ,润滑油脂由船厂提供 . The consumption of fuel oil, lubricating oil and grease for the Builder39。 s account shall be calculated as the difference between the supplied amount and the remaining amount in storage tanks and drums. 船厂账面燃滑油 ,润滑油脂的消耗量应在供应量与油舱内的剩余量上分别计算 . 154 Trial Trip 航行试验 Technical trial trip to be carried out according to the Class and National Authorities39。 requirements. 航行试验技术要求应符合船级社和国家机构的要求 . A special programme for technical trial trip to be submitted to the Owner at least 2 weeks before the trip. 对航行试验的特别程序应在试验前 2 周提交船东 . Tests to be included: 测试包括 : l. Anchor test according to the Class requirement 根据船级社要求的锚的测试 2. Steering gear test according to Class requirements 根据船级社要求的操舵装置测试 3. Manoeuvring test according to Class requirements. 操纵试验 4. UMS test which includes 4 hours continuous service with unnamed engine room. All alarms and service data for the main engine to be noted on a special form. The form to be enclosed with technical documentation at delivery. UMS 测试 ,包括主机连续 4 小时不间断工作 ,主机所有的警告 ,工作数据应填入特制表格 ,附入技术文挡中同时提交 5. Full speed test to be carried out at 1OO% output with the gearbox driven alternator developing zero output on the main engines and to be carried out with three double runs. 全速试验是在主机在交流电机驱动齿轮箱时 100%输出时进行的,并且是三 倍速运转。 i) 100% output on main engines with gearbox driven alternator at zero output. ii) 80% output on main engines with gearbox driven alternator at zero output. iii) 50% output on main engines with gearbox driven alternator at zero output. 6. Noise measurement to be carried out according to the National Authorities39。 regulations. Output on main engines to b。67m技术规格书
相关推荐
它,就必须购入替代品,否则影响正常工作的物品。 非必需品则可分为两种:一种是使用周期较长的物品,例如 1 个月、 3 个月甚至半年才使用一次的物品;另一种是对目前的生产或工作无任何作用的,需要报废的物品,例如已不再生产产品的样品、图纸、零配件、设备等。 必需品和非必需品的区分与处理方法如下表: 类别 使用频度 处理方法 备 注 必需品 每小时 放工作台上或随身携带 每天 现场存放(工作台附近)
350L 用至完工 合格 3 砂浆 搅拌机 HJ200 2 国产 2020 5 HJ2156 用至装修 合格 4 振动器 6 国产 2020 合格 5 钢筋切断机 QJ40 1 国产 2020 C940 合格 6 打夯机 HW60 4 国产 2020 4 用至室外 合格 7 装载机 ZL350 1 国产 2020 基础 合格 主要材料和半成品投入量 项目名称 单位 工程量 备注 土石方 M3
2 施工技术措施 ( 1)、施工总体安排 本工程由本项目部独立完成本施工段内的全部施工及验收工作 总体计划图如下: 18 ( 2)、施工方法与施工机械选择 工地运输施工方法与施工机械 表 32 作业内容 主作业机械选择 施工方法 适用范围 备 注 装卸 斗式装载机 装载机装车 车运砂、石等材料 装卸 汽车吊车 吊车装、卸车 车运成捆塔 材、线轴等捆装材料 汽车运输 载重汽车 机械装、汽车运、
热处理的目的是提高材料力学性能,消除残余应力和改善金属的加工性能,热处理主要分预备热处理,最终热处理和内应力处理等,本零件CA6140车床输出轴材料为45钢,在加工过程中预备热是消除零件的内应力,在毛坯锻造之后。 最终热处理在半精车之后精车之前,按规范在840℃温度中保持30分钟释放应力。 、制定艺路线按照先加工基准面,先粗后精,基准统一等原则,该零件加工可按下述工艺路线进行。
差模特性 共模特性 大信号动态特性 6. 简述放大 电 路 中噪声和干扰的来源和抑制的措施 作业布置 思考题: 1. 什么是集成运算放大 电 路。 将分立元件直接耦合放大 电 路 做在一个硅片上就是集成运放吗。 集成运放 2. 电 路 结构有什么特点。 3. 集成运放的电压传输特性有什么特点。 为什么。 4. 集成运放由哪几部分组成。 各部分的作用是什么。 5. 如何设置集成运放中各级放大 电