managinginternalequityandse(编辑修改稿)内容摘要:

ivisional firm  Decentralized infor. Division make budget based on Its own info. Senior managers determine the capital allocation. Balance somewhere Infor. asymmetry Means to control this problem: Ex post audit: efficient in a multiperiod model Ex ante audit: costly Internal capital MKT: within a multidivisional firm  Divisional rentseeking: Scharfstein and Stein (20xx)  The crosssubsidization: stronger divisions subsidize weak ones: Scharfstein and Stein (20xx). Shin and Stulz(1998) : investment in a given segment of a diversified firm is sensitive to CF of the firm’s other segments and is less sensitive to its own CF than is a singlesegment firm. Internal capital MKT  If external financing MKT is developed, firms tend to be focus。 otherwise, tend to be diversified. SEO infant star dog cash cow Investment opportunities Profitability of existing business If internal CF is Insufficient, SEO may have a positive react If SEO, MKT may have a negative react SEO  What’s the influence of SEO? ownership structure capital structure interest shift between old and new shareholders SEO  Methods of SEO private placement。 Wruck(1989) issuers are smaller。 a relatively bigger discount。 a positive MKT reaction The ownership structure hypothesis: anticipate change of managerial performance The infor. hypothesis: assessment of investment opportunities Hertzel and Smith (1993) SEO  Methods of SEO stock and stock option grant, employee stock ownership plans (ESOP) and dividend reinvestment plans (DRIPs) Rights offering have a deeply negative。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。