fishinspectionact(编辑修改稿)内容摘要:
other vehicle used for the carriage or storage of fish and may open any container that he has reason to believe contains fish。 (b) require to be produced for inspection or for the purpose of obtaining copies thereof or extracts therefrom any books, shipping bills, bills of lading or other documents or papers。 and (c) take any samples for inspection. Warrant required to enter dwellinghouse s. 4() () Where any place or premises referred to in paragraph (1)(a) is a dwellinghouse, an inspector may not enter that dwellinghouse without the consent of the occupant except under the authority of a warrant issued under subsection (). 来自 中国最大的数据库下载 PART I FISH AND FISH CONTAINERS ss. 3 to 11 Authority to issue warrant s. 4() () Where on ex parte application a justice of the peace is satisfied by information on oath (a) that the conditions for entry described in paragraph (1)(a) exist in relation to a dwellinghouse, (b) that entry to the dwellinghouse is necessary for any purpose relating to the administration or enforcement of this Act, and (c) that entry to the dwellinghouse has been refused or that there are reasonable grounds for believing that entry thereto will be refused, the justice of the peace may issue a warrant under his hand authorizing the inspector named therein to enter that dwellinghouse subject to such conditions as may be specified in the warrant. Use of force s. 4() () In executing a warrant issued under subsection (), the inspector named therein shall not use force unless the inspector is acpanied by a peace officer and the use of force has been specifically authorized in the warrant. 来自 中国最大的数据库下载 PART I FISH AND FISH CONTAINERS ss. 3 to 11 Interference with inspector s. 4(2) (2) No person shall obstruct, impede or refuse to admit an inspector or other person acting in execution of this Part or any regulation made thereunder and no person shall aid or assist any person in obstructing, impeding or refusing to admit such an inspector or other person. Administering oaths s. 6 6. For the purposes of this Part, inspectors may administer oaths and take and receive affidavits, declarations and solemn affirmations. ., c. F12, s. 6. Seizure of fish and containers s. 7(1) 7. (1) An inspector may seize all fish, containers and other things by means of or in relation to which the inspector believes on reasonable grounds that an offence against this Part or any regulation made under it has been mitted. 来自 中国最大的数据库下载 PART I FISH AND FISH CONTAINERS ss. 3 to 11 Detention of seized fish and containers s. 7(2) (2) A thing seized under this Act, or the proceeds realized from its disposition, shall not be detained after (a) an inspector determines that this Act and the regulations have been plied with in relation to the thing, or (b) the expiration of one hundred and eighty days aft。fishinspectionact(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。