basicstatisticsuseofminitab(编辑修改稿)内容摘要:
Belton Confidential: For training only 16 Interquartile range The interquartile range is another measure of dispersion. IQR = Q3 Q1 The interquartile range is less sensitive to extreme values in a sample than the range. For the two samples (1, 3, 5, 8, 9 and 1, 5, 5, 5, 9), their interquartile ranges are 5 and 0 respectively. Belton Confidential: For training only 17 Measure of Shape Skewness Skewness The degree of assymmetry of a distribution around its mean is referred to as its skewness. Belton Confidential: For training only 18 Measure of Shape Kurtosis Kurtosis Kurtosis characterizes the relative peakedness or flatness of a distribution pared to a normal (mesokurtic) distribution. Belton Confidential: For training only 19 MiniTab’s Descriptive Statistics Stat Basic Statistics Display Descriptive Statistics produces statistics for each column of data (or subsets within a column) and displays them in the Session Window and optionally in a graph the user has no control over which statistics are puted/displayed Stat Basic Statistics Store Descriptive Statistics descriptive statistics for each column (or subsets within a column) are displayed in adjacent columns within the Worksheet the user can select which statistics are to be puted/displayed, but has no control over the order in which they are displayed Instructor will show you the method of using Minitab. Belton Confidential: For training only 20 Graphical Presentation Visual interpretation the the data set. Common graphical tools to illustrate a data set: Dot Plot Box Plot Histogram Stem amp。 Leaf Diagram Belton Confidential: For training only 21 Dot Plot The dot plot is useful for displaying a small body of data. The location or central tendency in the data set and its spread or dispersion are easily identified. It can also be used in paring two or more data sets. Belton Confidential: For training only 22 Dot Plot The pull strength of bonding wires from two suppliers are shown below A : B : The Dot Plot reveals that wires from supplier A seems to result in lower pull strength , but the variability within both groups is about the same. Suppl i。basicstatisticsuseofminitab(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。