mep黄海船厂吊机技术规格书克令吊内容摘要:
ck detector : For hoisting wire rope only. 钢绳松弛限制器: 仅用于升降钢绳。 Resistance thermometer sensor : ℃ & Min .5℃ of oil temp. 温度继电器: 控制最高和最低的油温( Max70℃,Min5℃)。 Starter interlock : Handle neutral position at starting. 起动器联锁装置: 用于启动操作部位。 Float switch : Low level of hyd. Tank. 浮子开关: 油箱液压油的低油位报警。 Emergency stop : All motion are stopped in case of emergency. 紧急停止: 万一出现紧急情况时,所有动作停止。 每一吊车 还应在 基柱上提供紧急停止按钮( IP56) Note 注: Jib is lowered rest position by the select switch with key( bypass key) under no load. 无负载时,吊臂可通过旁通开关放置到搁置位置 5. Structural parts 结构件 Major structural parts will be tightly posed of steel plates in accordance will classification’s rule. Each section of structure is designed to consider with impact load, horizontal lad and loading frequency. 主要结构件是选用船级板或低合金板牢固焊接而成。 每部分结构在设计上都考虑了冲击载荷,水平载荷和载荷频率。 Jib MEP SYSTEMS PTE LTD Sixth Lok Yang Road 0303 Scotts amp。 English Bldg Singapore 628100 Tel: +65 6265 6860 Fax: +65 6266 3267 Email: . Website: Co Registration No. 202002632R Page 9 of 24 Deck Machinery Manufacturer New Building Project Management Marine amp。 Offshore Equipment Product Representation Ship Management AfterSales Serv ice Centre 吊臂 The jib is box type that is constructed with the welded steel plates and mounted with the hoisting and luffing sheaves on the top of it. The jib is fitted to the crane tower by jib bearing unit. Bearings of jib pivot are used of Selfaligning roller bearings. Jib angle pointer of gravity type is fitted on jib. 吊臂是用钢板焊接而成的箱型结构件,在其顶端上装有升降和变幅滑轮 .吊臂通过轴承装置安装在吊车塔身上 .吊臂枢轴轴承采用关节轴承 .重力型吊臂角度指示器安装在吊臂上 .。 Crane Tower 吊车塔身 In the crane tower machinery equipment, hydraulic equipment and electric equipment are installed. The crane tower to be constructed with the welded steel plates, and hoisting, luffing and slewing devices are mounted in the tower. Operator’s cabin and front door are fitted on the crane housing. 吊车塔身内装有机械设备、液压装置和电气设备。 吊车塔身由钢板焊接而成,起升机构、变幅机构和回转机构装在其内。 驾驶室及前门装在塔身上。 Operator’s Cabin 驾驶室 Operator’s cabin is located at front side of the crane tower so that the operator can look out over the loading conditions easily. 驾驶室装在吊车塔身的前面,以便于操作者能方便地看清装载情况 The cabin is waterproof type and reinforced glass is used for the window. Control handles, control box, contactor box, space heater, fan, fire extinguisher and electric type wiper are arranged in it. 驾驶室为防水型,窗玻璃采用钢化玻璃。 操作手柄、控制箱、接触器箱、空间加热器、 空调 、灭火器及电动雨刮器安装在驾驶室内。 6. Mechanical equipment 机械设备 Hoisting and luffing Device 起升和变幅机构 Hoisting and Luffing devices laid on mon frame are installed in the crane tower. These wire drums are driven by each brake drum and are operated by hydraulic pressure automatically in connection with the operating handles. The drums of welded steel plates have a groove for wire rope. Manual release device of brake is provided on hoisting, luffing and slewing device for emergency ( . electric power failure) . 装着起升和变幅机构的绞车,装在吊车塔身内;钢丝绳卷筒由液压马达驱动;每个绞车上有一个液压弹簧碟片式刹车,刹车与控制手柄关联,通过液压自动控制。 Slewing Device 回转机构 Slewing Device( s) is installed on the crane housing floor. The pinion which engages with the gear of slewingbearing is driven by hydraulic motor via reduction gear. MEP SYSTEMS PTE LTD Sixth Lok Yang Road 0303 Scotts amp。 English Bldg Singapore 628100 Tel: +65 6265 6860 Fax: +65 6266 3267 Email: . Website: Co Registration No. 202002632R Page 10 of 24 Deck Machinery Manufacturer New Building Project Management Marine amp。 Offshore Equipment Product Representation Ship Management AfterSales Serv ice Centre Slewingbearing( s) is made of ball or roller bearing with enough carrying capacity and life. Hydrobrake is provided on the hydraulic motor. 回转机构装在大底板上,与回转轴承啮合的小齿轮由液压马达通过减速机驱动;回转轴承由高承载能力及高使用寿命的球或滚柱做成;刹车的高压油由马达提供。 Pump Unit 泵组 The pump is coupled with electric motor directly without reduction gear. 泵组直接与电机相联,中间没有减速机。 Wire Rope 钢丝绳 The following wire ropes will be used. Having been taking into consideration breaking strength, a safety factor of wire rope shall satisfy the Rules or regulations. 考虑到钢丝绳的抗拉强度、安全系数要满足有关规范要求,采用下述钢丝绳。 For Hoisting 起升钢丝绳 For Luffing 变幅钢丝绳 Construction 结构 Nonrotating type 34 Strands 非回转型 34股 6 Fi(29) Galvanization 镀锌 Special Galvanization 特种镀锌 Rope end 索端 One : Wire Socket Deadeye thimble 一端:耳板套环 Other : Seizing 另一端:捆扎 One : Wire Socket Deadeye thimble 一端:耳板套环 Other : Seizing 另一端:捆扎 Wire specification is described in 〝 .〞 drawing which shall be submitted for the Works and Finished Plan. 钢丝绳的规格在 “总图 ”中说明,该资料作为工作图和完工图一并交付。 Loose Gear 活动装置 The loose gear, hook and shackle have a enough strength to hoist the rated load. It is possible to rotate the eye hook by hand easily. MEP SYSTEMS PTE LTD Sixth Lok Yang Road 0303 Scotts amp。 English Bldg Singapore 628100 Tel: +65 6265 6860 Fax: +65 6266 3267 Email: . Website: Co Registration No. 202002632R Page 11 of 24 Deck Machinery Manufacturer New Building Project Management Marine amp。 Offshore Equipment Product Representation Ship Management AfterSales Serv ice Centre 活动装置、吊钩和卸扣都具有足够的强度起吊额定载荷,用手可轻松拔动钩环使其旋转。 Operating condition 工况 Up to 36t 36吨以下 Loose gear type 活动装置形式 SB + SB + C Hook C型吊钩 7. Hydraulic equipment 液压设备 Hydraulic parts 液压部件 Major hydraulic motor and the accessories produced by Parker are used. 主要的液压马达和附件均采用 Parker生产的产品,采用变量柱塞泵和弯轴式定量轴向柱塞马达。 Hydraulic Circuit 液压回路 Opened system will be adopted into hydraulic circuit ( used for hoisti。mep黄海船厂吊机技术规格书克令吊
相关推荐
电阻负载 ) 手动开关,方便调式和监测 宽度:约 8 个单元(模数) 窗帘控制模块 Shutter Actuator REGK/6*(1*230) 每通道最大输出: 6A 6 个控制通道。 其中 3 个通道可以用作双值输出功能 宽度:约 8 个单元(模数) 窗帘控制模块 Shutter Actuator REGK/4*(1*230) 4 通道
机密,所有员工自进公司之日起,应该自觉维护公司整体利益,自觉遵守公司保密制度: 1. 遵照国家《保密法》规定,接受保密教育,树立保密观念,遵守保密 纪律,不该说的不说,不该给别人看的资料不给看,下班离岗时,不该拿走的技 13 术、业务、营销计划等资料不拿,以确保公司技术、业务和营销机密的安全可靠。 2. 员工在受聘期间获得的一切技术及专利情报均属于公司机密,必须严加保护,不得泄露、转移。 3.
聚焦 , 显示绿色的十字在聚焦方格中 8. 移动倍数滑杆 , 把放大倍数调回你需要的位置 21 第四章 应用自动工具和手动光标 聚焦设置 在自动聚焦设置窗口可以改变或选择自动聚焦的设置 : 移动宽度和高度滑杆或键入象素值到相应的区 域来更改方框的大小 . 最大是 250 象素 , 最小是 10 象素 如果想同时调节方框的宽度和高度 , 选中 Adjust All 打开 Grid
菜间种、套种、混种或种一季蔬菜的菜地,不归入菜地,而应归入相应地类; ④ 撂荒地按照《关于耕地抛荒有关问题的批复》(国土 资函 [1998]336 号)文件的规定,按 照撂荒前地类调查。 61548。 园地调绘 一般指覆盖度 ≥50 %、合理株数 ≥70 %、已经挂果有收益的种植果树、桑树、茶园及花卉、药材的土地,但个别规划成片的果树,虽然未挂果,也可调绘为园地地类。 2020 年 1