房屋建筑施工组织设计范本-本科毕业论文设计内容摘要:

............... 72 安全教育与安全检查制度 ..................................................................... 73 专项安全管理 ............................................................................................... 74 劳务用工管理 ......................................................................................... 74 安全防护管理 ......................................................................................... 74 临时用电管理 ......................................................................................... 76 施工机械管理 ......................................................................................... 77 消防保卫管理 ............................................................................................... 78 西南大学本科毕业(设计)论文 5 9 环境保护与文明施工管理 .................................................................................. 79 环境保护管理 ............................................................................................... 79 环境管理目标 ........................................................................................ 79 环境管理体系 ........................................................................................ 79 环境管理因素 ........................................................................................ 79 环境管理措施 ........................................................................................ 80 文明施工管理 ............................................................................................... 82 文明施工管理目标 ................................................................................. 82 建立管理制度 ......................................................................................... 82 现场管理 措施 ......................................................................................... 83 参考文献 .................................................................................................................. 84 致 谢 ....................................................................................................................... 85 西南大学本科毕业(设计)论文 I 奥园 A 区 12楼施工组织设计 西南大学工程技术学院,重庆 400716 摘要:本施工设计是针对奥园 A区 12楼进行编制的。 奥园 A区 12楼是高层花园式住宅楼,结构类型为框架───减力墙结构。 该施工组织设计作为规划和指导该工程施工准备到施工验收整个过程的综合性技术经济文件。 在编制时,对工程质量目标、工期目标、项目管理机构设置、施工进度计划、施工机械、周转材料及设备、主要施工方法、劳务组织、安全文明施工、环境保护等诸多因素做了充分考虑;并以国家有关技术政策、规定、业主的要求、设计图纸、招标文件、施工现场相关资料为依据;严格按照施工组织设计的编制原则,从施工全局出发,结合工程的实际情况,利用科学的组织管理方法,合理的组织安排各项资源,以期 达到消耗少、工期短、质量高,造价低的最优效果。 关键词: 施工组织; 组织管理;质量保证;施工方案 西南大学本科毕业(设计)论文 II 西南大学本科毕业(设计)论文 III Austrian Park Area A 12 floor construction design LIU Yan College of Engineering and Technology, Southwest University, Chongqing 400716, China Abstract: The construction design is against Austrian Park Area A 12 for the preparation of the floor. Austrian Park Area A is the top floor, 12 gardenlike residential buildings, structural framework for the type ─ ─ ─ by the wall of the structure. The construction design as a guide the planning and preparation for the construction of acceptance to the whole process of prehensive technical and economic documents. In preparation, the quality of the project objectives, period goals, project management institutions, the construction schedule, construction machinery, equipment and material flow, the main method of construction, labor anizations, safe and civilized construction, environmental protection and many other factors made full consideration。 And to the relevant national technology policy, regulations, the owners of the requirements, design drawings, tender documents, related to the construction site are based on information。 In strict accordance with the construction of the principle, anizational design, construction from the overall interests, works with the actual situation, the use of scientific methods of anization and management, rational anization of the resources to 西南大学本科毕业(设计)论文 IV meet the consumption of small, short construction period, highquality, low cost of the most Excellent results. Key Words: construction anization。 anization and management, quality assurance, construction programme 西南大学本科毕业(设计)论文 1 文献综述 施工组织设计是指针对拟建的工程项目,在开工前针对工程本身特点和工地具体情况,按照工程的要求,对所需的施工劳动力、施工材料、施工机具和施工临时设施,经过科学计算、精心对比及合理的安排后编制出的一套在时间和空间上进行合理施工的战略部署文件。 通常由一份施工组织设计说明书、一张工程 计划进度表、一套施工现场平面布置图及工程进度图组成。 施工组织设计是工程施工的组织方案,是指导施工准备和组织施工的全面性技术经济文件,是现场施工的指导性文件。 由于建筑产品的多样性,每项工程都必须单独编制施工组织设计,施工组织设计经审批通过后方可施工。 在组织施工或编制施工组织设计时,应根据建筑施工的特点和以往积累的经验,遵循以下几个原则。 认真贯彻基本建设工作中的各项有关方针、政策,严格执行基本建设程序和施工程序的要求。 严格遵守国家和合同规定的工程竣工 和交付使用的期限。 合理地安排施工程序。 在采用先进、适用的技术和经济合理的前提下,在多方案比较的基础上,选择最优的施工方案。 组织流水施工,以保证施工连续地、均衡地、有节奏地进行。 西南大学本科毕业(设计)论文 2 恰当地安排冬、雨季施工项目,增加全年的施工日数,提高施工的连续性和均衡性。 减少暂设工程和临时性设施,合理布置施工平面图,节约施工用地。 贯彻工厂预制和现场预制相结合的方针,扩大预制范围,提高预制装配程度。 充分利用 机械设备并扩大机械化施工范围和提高机械化程度,减轻劳动强度,提高劳动生产率。 制定技术、组织、质量、安全、节约等保证措施,避免质量和安全事故,降低工程成本,提高工程经济效益。 施工组织设计在每项建设工程中都具有重要的规划作用、组织作用和指导作用。 施工组织设计是直接指导具体施工的,是施工单位实现既定的质量目标、进度目标、效益目标的“特别规范”。 施工组织设计应用于施工全过程,集技术、经济、管理和合同于一体,是一份全面的施工计划和合同文件。 通过编制施工组织设计,可以合理 的确定各种临时设施的数量、规模和用途;可以充分考虑施工中可能遇到的困难于障碍,主动调整施工中的薄弱环节,事先予以解决或排除,从而提高施工的预见性,减少了盲目性,使管理者和生产者做到心中有数,为实现建设目标提供技术保证。 具体表现在: 施工组织设计时拟建工程项目施工准备工作的一项重要内容,同西南大学本科毕业(设计)论文 3 时又是指导各项施工准备工作的依据; 可体现实现基本建设计划和设计要求,可进一步验证设计方案的合理性和可行性; 为拟建工程项目所确定的施工方案、施工进度和施工顺序等,是指导开展紧凑、有序施工活动的技术依据; 所提出的拟建工程项目的各项资源需要量计划,直接为物资组织供应工作提供数据; 对现场所作的规划和布置,为现场的文明施工创造了条件,并为现场平面管理提供了依据; 对施工企业计划起决定和控制作用。 施工计划是根据施工企业对建筑市场所进行科学预测和中标为结果,结合本专业的具体情况,制定出的企业不同时期应完成的生产计划和各项技术经济指标。 而施工组织设计是按具体的拟建工程项目开竣工时间编制的指导施工的文件。 内容 施工组织总设计的内容 (1)工程概括和工程特点的说明。 (2)施工总进度计划和主要单位工程的进度计划。 (3)总的施工部署和主要单位工程的施工方案。 (4)分年度的各种资源的总需要量计划 (包括劳动力、原材料、加工构件、施工机械、安装设备等)。 (5)全场性施工准备工作计划 (包括 “ 三通一平 ” 的准备,临时设施施工的准备,原有道路、房屋、动力和加工厂条件的利用,机构组。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。