珠海国际赛车场有限公司20xx年10月zicoctober20xx内容摘要:
retirement from the race. 2. Qualifying: The grid will be based on the fastest time recorded by any of the drivers in qualifying session. 3. Refueling Rigs: can be provided by the anizer (capacity: 40L, rental fee and deposit is pulsory and paid before practice), or can use team’s own refueling tank (Maximum capacity: 60 liters, Class Open is free), all subject to inspection and approval at scrutineering. 4. Refueling: Car must be stationary and engine must be turned off before refueling. Driver cannot stay inside the car and repair of the car is forbidden during refueling. Refueling crew must be dressed in fire preventive clothing and helmet and at least 1 person must be on standby with a fi。珠海国际赛车场有限公司20xx年10月zicoctober20xx
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。