数位媒体新观内容摘要:

Fluxes 多以活動、表演方式發表作品,也成為跨領域藝術合作的蓬勃開始。 Fluxus  From Wikipedia, the free encyclopedia  Fluxus – a name taken from a Latin word meaning to flow – is an international work of artists, posers and designers noted for blending different artistic media and disciplines. They have been active in visual art and music as well as literature, urban planning, architecture, and design. Fluxus is often described as intermedia, a term coined by Fluxus artist Dick Higgins in a famous 1966 essay. For example, poetry and visual art intersect in visual poetry, while text and per。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。