researchonlearningstrategies内容摘要:

ecked C. drove D. changed 根据上下文线 索,上文用到 could“很可能”表示一种推测语气 考察连接词 , 结合上下 文 :低智商与高技术,此处应为转折语气 因为擅长修车,所以别人将故障车送来时,他总是能“修理” 第三段:作者提出自己的观点:在他的工作范围内他的能力远不如这位智商不高的汽车修理工。 Well, then, suppose my autorepair man 6. ______ questions for some intelligence tests. By every one of them I’d prove myself a7. ____. In a world where I have to work with my 8. _____, I’d do poorly. designed fool hands 6. A. answered B. practised C. designed D. tried 7. A. teacher B. doctor C. winner D. fool 8. A. brains B. effort C. hands D. attention 根据下文线索“我回答不上”,可推知作者在此意思 结合上下文进行推理 由上下文可知,博士智力水平很高,但动“手”能力较差 poorly 第四段:作者举事实来证明观点。 本段是全文的主体内容。 Consider my autorepair man 9. _____. He had a habit of telling 10. _____. One time he said, “Doc, a deafanddumb man 11. _______ some nails. Having entered a store, he put two fingers together on the counter and made 12. __________ movements with the other hand. againjokes needed ha mering 9. A. again B. as usual C. too D. as well。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。