jiashanmiddleschool---kerry唐佳睿内容摘要:
eive D. has received 2. Up to now, the program _____ thousands of children who would otherwise have died. A. would save B. saves C. had saved D. has saved ( 2020山东卷) 现在完成时表示该动作过去已经开始,持续到现在,而且还可能继续下去的动作状态,往往和表示一段时间的状语连用。 它们是 recently, in the past few days, since, for a long time, so far, up to now, until now等。 Seems you are quite familiar with Russia. That is because I ____ the country in 2020. A. have visited B. were visiting C. had visited D. visited 一般过去时 处的状态,与现在没有关系。 经常与表示过去的时间状语连用,如 yesterday, last week, an hour ago, just now, the other day, in 1982等。 ,但实际上是“刚才,刚刚”发生的。 表示事先不知道,但现在已知道的事。 Excuse me. I _____ I was blocking your way. ’t realize B. don’t realize C. haven’t realized D. wasn’t realizing 3. Remember the first time we met, Mary? Sure. You_____ in the supermarket. shopped B. shopped C. were shopping D. have shopped of this kind ______ in both the . and Europe well before the Second World War. conducted B. have been conducted C. had conducted D. had been conducted 2. We arrived at work i。jiashanmiddleschool---kerry唐佳睿
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。