descartes39meditations内容摘要:

ve It exists! Perfect Vacation Spot • Does this prove the perfect vacation spot exists? • No: Since the “perfect” vacation spot doesn’t have all perfections. • Only God has all perfections, so this only works to prove that God exists. • Rats! Descartes’ Second Proof of God’s Existence: • The concept of God includes all perfections. • Existence is a perfection. •  God has existence. A perfection is a positive quality to a maximal degree. But is existence a quality? Perfect Vacation Spot Warm, breezy Not crowded Inexpensive It exists What does that add to the picture? Descartes’ Second Proof of God’s Existence: • The concept of God includes all perfections. • Existence is a perfection. •  God has existence. Is existence a quality? Immanuel Kant (17241804) No! Existence is not a quality: • “There is a small, red ball.” • In Logic: (x)(Sx amp。 Rx amp。 Bx). • S (small), R (red), and B (being a ball) are all qualities, but not  (existence) is not. Descartes’ Second Proof of God’s Existence: • The concept of God includes all perfections. • Existence is a perfection. •  God has existence. Is this a good argument?。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。