by林赛清mar,3120xx内容摘要:

d to (受欢迎 ) old people,while young people didn’t like it very much and where will the movie (上演 ) so excited there was none left because of goes well setting the table smiling faces say thanks toone of is full of be popular with be shown 同学们加油。 worried nervous She feels nervous. She feels worried. How does he/she feel? sad angry How does he/she look? She looks angry. He looks sad. Grammar focus Linking verb +adjective You look so excited. I feel disappointed. The boy seems worried. The food tastes so delicious. It smells terrible. Did she sound worried? She was very sad and went mad. The father was lonely and often became angry because of the noisy children. 语法疏导 系表结构 (系动词 +adj.)的基本用法 ,即连系动词用于连接主语和表语 ,说明主语的性质 状态或身份等 .  :be是 , grow渐渐变得 , feel感觉 , stay仍然。 保持 , sound听起来 , look看起来 , smell闻起来 , taste品尝 ,尝起来 , seem似乎 , get变得 , turn转变 , bee变成 ,成为 , go变 , keep保持 +形容词或名词 (表语则由形容词或名词充当 ,注意不能用副词 )  ’’好像 ,似乎 ,看来” ,其用法为 :  1) se。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。