管道油漆修补方案内容摘要:
清洗就能除去的局部涂层区域。 B、 Method of painting repair 涂层修补的方法 For weld seam are or damaged area of coating: Use power sand paper disc to grind the weld seam area or damaged area of coating to Grade St3(damaged coating has been removed entirely ), the pipe welding joint will be treated by manual blasting machine by a level of area and unbroken area shall have a overlapping slope. Overlapping area shall appear new and fresh surface of coating to enlarge bonding force between repair coating and raw coating. Repair position shall be cleaned adequately after preliminary surface treatment, then repair painting as per the whole set of painting repair system and arrive the designed film thickness. For small area, brush painting shall be used. But spray coating shall be used for midcoating and final coating when more coating areas connected together. Brushing style will be taken to the touch up works to ensure the appearance of the coating. 对于焊缝区域或者涂层损坏区域:应用动力砂纸片将焊缝区域和涂层损坏区域打磨处理到 St3 级(被损坏的涂层应完全清除), 管道焊口采用手持式喷砂机,除锈等级。 损坏区域与完好区域涂层应的边缘部位应砂磨出搭接坡度,搭接区域的原涂层应砂磨漏出新鲜的涂层表面,以增加修补涂层与原涂层的结合力。 修补位置基层表面处理结束后,应充分清洗该表面,然后按修补油漆配套系统进行涂层修补并达到设计要求的干膜厚度。 油漆涂层修补采用刷涂,确保修补涂层的外观。 对于涂层缺陷,涂层龟裂,涂层污染的部位修补:先砂纸片,砂布或其他方 法清除缺陷涂层和严重污染涂层。 然后按照对该部位涂层进行砂磨和清洗,并保证搭接涂层边缘一定的搭接坡度和新鲜的涂层表面。 再按照修补涂层系统进行修补,涂层修补的其他要求同上节。 C、由于固化后的无机锌涂层很难进行自覆涂,因此,对于有缺陷和损坏的无机锌涂层应采用环氧富锌进行修补。 D、 被修补的涂层或基层表面应清洗干净,无污染物,如存在油污应充分清洗 油污(达到 SSPCSP1 标准)。 E、 为确保修补涂层的外观,建议较大面积的涂层采用喷涂的方法施工。 注: 检查管道外观,对所有在运输、倒运、现场焊接 等过程中破坏的涂漆用记号笔做好标记,并标记出打磨处理的范围。 确定现场焊口,未试压管段焊口以及不锈钢管的具体的位置。 做好标记。 Surface Preparation 表面处理 Surface preparation before painting 涂漆前的表面处理 Surface preparation request: grade. St3, thorough rust removal by hand or power machine or arrive Grade by mechanical rust removal. 表面处理粗糙度要求: St3 级 彻底的手工和动力工具除锈或者采用机械除锈达到 级。 Treatment by hand: Unwound scale, rust and aging coating on pipes can be removed in using wire brush or rubber paper or manual machine or spade. 人工处理:管道表面上松散的氧化皮、锈蚀和老化涂层可用钢丝刷刷掉、砂皮纸砂去、用手工工具刮掉或铲除 Power treatment: It’s better to use power machine than manual machine when removing scale, rust or aging coating. But it can’t be used to remove the rust or scale attached to pipe surface firmly. Normally used power machine includes :wire brush, impulse tools, grinding machine and rubber sharpening machine. Pay more attention not to polish the metal surface, especially when using power wire brush, or it will destroy the required surface roughness. 动力处理:在清除松散的氧化皮、锈蚀和老化涂层时,用动力工具比用人工效果好,而且省力。 但是动力工具不能除去紧紧附着在管道表面的锈蚀和氧化皮。 通常采用的动力工具,包括钢丝刷、冲击工具、砂轮机及砂皮磨光机。 但是必须注意,不要抛光金属表面,尤其是在使用动力钢丝刷时,否则会破坏涂覆所需的表面粗糙度。 For cracked coats, grind the coat in the crack area letely to reach required roughness , and then merce the repair paint work。 对于龟裂的涂层,需将龟裂处涂层彻底打磨,并达到规定的粗糙度要求后再进行油漆的修补。 For cracked and slightly scratched coats, do not grind too hard。 Only grind to the base coat for repairing with Interthane 990 topcoat。 对于轻微损伤的涂层,不需打磨过深,只需要适度打磨即可进行修补,可直接用 Interthane 990 面漆。 The repairing area should have 30—50mm adjoining area with the preexisting coat。 The grinding should have some gradient to insure the repaired coat connects well with the preexisting coat。 修补区域与原有涂层有 30—50mm 的搭接,要求打磨成一定的坡度,用于修补涂层与原有涂层平滑过渡。 Painting 涂漆 Painting must be done in a nice weather。 doing in raining, fogging, snowing and heavy dust is 工,在 雨,雾,雪和较大灰尘的条件下禁止施工。 Ensure the surface to be painted is clean. The surface can be cleaned with dust collector or brush etc. The same treatment shall be done again after each film is dry. Then next coating can be 必须保证清洁干净。 涂漆前用吸尘器,刷子等清理干净,每层涂膜干燥后 需经同样处理后,方可涂下一层涂料。 Ensure the seperation from other ponents around in the event that any contamination occur prior to painting, and especially much attention to ground pretection shall be taken in case of any soil pollution. Separateing material can use tape (small range),color clothing and wood board. 涂漆前必须对周围其它部件进行隔离以免造成周围部件的污染,特别注意对地面的保护以免造成土壤的污染。 隔离材料可采用胶带(小范围)、彩条布、木板等 .。管道油漆修补方案
相关推荐
,冬季施工期间用砂中不得含有直径大于 1cm 的冻块,不得含有冻灰膏、冻灰浆等。 3)、组成材料要优先考虑加热水,(加热方法由商品混凝土站统一考虑)当 水加热达不到要求温度时,考虑对砂石加热,当石子干燥无冻块时,可只加热砂子。 拌合水加热≤ 80℃,骨料加热≤ 60℃。 4)、混凝土浇筑时间应尽量选在上午 9: 00 以后,下午 16: 00 以前气温较高的时间,浇筑完毕要及时覆盖保温。 5)
程示意图 沣西新城应急给水厂深井泵房工程 给水管道 试水打压 施工方案 陕西有色建设有限公司 5 向管内灌水时,应缓慢充水,以免产生水锤。 此时,应先打开管道系统高处的排气阀将空气 排尽,由试压管段最低点向管段注水待水灌满后,关闭排气阀和低点的进水阀。 试压合格后,将压缓缓泄掉,将水排至下一管段循环利用或排至规划地段。 施工中应注意的问题 ①分段:根据设计说明管路较长时,每次试验长度不宜超过
4mm,R=6mm,m=5mm,h=10mm,h1=12 mm,l=36 mm,f=2 mm,T=8 mm,C=2 mm,a0=45mm 镗刀截面 BB=88(mmXmm) 主轴直径 d=25(mm) 由式 d=B 4√(M/100) 查《组合机床设计》 p59 表 315 得 ,取系 B=。 夹具设计的有关计算 原动力计算 年生产率 30万件,一年 365天,每天 8小时工作,所以有
后 ,必须按插入长度要求在管端表面划出一 圈标记 .连接时将插口端对准承口并保持管道轴线平直 ,将其一次插 入 ,直至标记外露在承口端部 . 4),公称外径不大于 200mIll的小管经管段安装时宜用人力 ,推 入到位的方法进行施工 ,公称外径大的管子 ,可用手动葫芦 ,紧绳 器等专用拉动工具进行安装施工 . 5),严禁用施工机械强行顶管或强行插入 .如插入时阻力过 大 ,应拔出检查胶圈是否扭曲
洗现场,配备足够的氮气钢瓶,以备清洗后管段、阀件、仪器等吹扫使用。 安全措施已落实到位。 临时管线安装 临时配管管径,原则上主管不得小于 10mm,支管原则上必须与正式配管同径,当正式工程配 管管径大于 100mm时,临时配管在接口外采取缩径方式连接,但变径不得一次大于 50mm,否则采取二次变径方式连接。 化学清洗用临时配管材料应使用无缝钢管、无缝管件。 法兰可采用钢板割制而成。 拆除阀门
采取相应对策,以达到有效控制基坑变形,确保基坑施工安全。 各项监测的时间间隔可根据施工进程确定。 当变形超过有关标准或监测结果变化速率较大时,应加密观测次数。 当有事故征兆时,应连续监测。 监测点的布置应满足监控要求,从基坑边缘以外 1 倍开挖深度范围内的需要保护物体均应作为监控对象。 位移观测基准点不少于两个, 且应设于影响范围以外。 基坑监测频率 序号 监测项目 量测频率 1 沉降监测