外文翻译——浅析工程量清单招投标内容摘要:
bidding. Shorten the Bidding Period Avoid Duplication of Work The bill of quantities tender return to play a role of pretender estimate of existing quantity, avoid the tenderee, adopted, bidders repeat budget, save a lot of people, material, content, shortening the time of bidding at the same time, improve the efficacy, the negative effects caused by the error of the service, reasonable and fair accurately, to facilitate practical. Unified Price According to the Standard Bidding Behavior of Fair Competition The bill of quantities bidding, to avoid the fraud in the project bidding, manipulation and other illegal behavior, is conducive to the cultivation of clean government and purify the construction market environment, regulating the behavior of bidding, and caused due to the disunity of quantities on the price of error, is measured on bid the price level and its rationality of the enterprise, is advantageous to the correct evaluation. In Line with International Practice Contract on international contracted projects often have a general contract, unit price, cost plus fee contract and turnkey contract to wait for a few kinds. Total price is usually the same contract by bidders pete to determine the total project, the owner and contractor in accordance with the fixed settlement construction cost, not because of quantities, the equipment, materials prices, wages and other changes to adjust the contract price, its disadvantage is often due to the contractor to bear the risk of quantity and unit price of double. In bidding for a project, the unit price contract is a contract unit, the partial engineering quantities listed according to the tender documents to determine the cost of each division subdivisional work contract types. 3 For the Requirements of the Bill of Quantities Bill of quantities provided by the tenderer in the tender documents, as a basis for the contractor39。 s tender offer, especially in the unit price contract to, want to use strictly according to the breakdown of quantities given in the bill of quantities calculation unit price multiplied by the summary of quantities for the total price. Project list is stipulated in the contract should implement all of the engineering project and content according to the project site, properties such as listed in a series of tables, each table in both engineering parts and the parts need to be on the implementation of each project, and each item of quantities and valuation of requirements, as well as the price for each project and each 外文翻译 7 table bined meter, etc. In the bill of quantities of quantities are estimated and provisional, only do bidding quotation. The purpose of the bill of quantities is: for bidders to bid, for the bidder provides a mon basis of petitive bidding。 Used for the settlement in the process of project implementation。 Add new projects in the engineering change or claim processing, can choose or reference in the bill of quantities unit price to determine the unit price and the price of the new project. When prepare the bill of quantities so attention should be paid to separate different level requirement is obtained。 Will the same properti。外文翻译——浅析工程量清单招投标
相关推荐
the structure.6. Soils and FoundationsAll building are supported on the ground, and therefore the nature of the soil bees an extremely important consideration in the design of any building. The
小横杆的计算 小横杆按照简支梁进行强度和挠度计算,大横杆在小横杆的上面。 用大横杆支座的最大反力计算值,在最不利荷载布置下计算小横杆的最大弯矩和变形。 大横杆的自重标准值 P1= = 脚手板的荷载标准值 P2= 活荷载标准值 Q= 荷载的计算值 P= + + = 小横杆计算简图 最大弯矩考虑为小横杆自重均布荷载与荷载的计算值最不利分配的弯矩和 均布荷载最大弯矩计算公式如下 :
进行解密处理,读取解密后的报关单数据。 5)、 读入成功,系统将提示读入的报关单张数、条数、耗用时间。 认证发票信息读入读入步骤 : 1) 基础数据采集 —— 外部数据采集 —— 认证发票信息读入 2)选择发票的 XML 文件进行读入(注意:文件类型选择 xml。 ) (二 )申报明细数据录入(申报中最主要的工作,不仅量大而且易出错,务必详细阅读) 执行“基础数据采集 出口 /进货数据明细录入”
parts with plex geometry. However, the mechanical properties of these parts often do not meet the requirements concerning the mechanical properties (. endurance strength and ductility). A promising
178。 整个大窗更要注意上窗的位置。 门窗扇的安装 ( 1)施工准备 1)安装门、窗扇前,先要检查门窗框上、中、下三部分是否一 样宽,如果相差超过 5mm,就必须修整。 2)核对门、窗扇的开启方向,并打记号,以免把扇安错。 3)安装扇前,预先量出门窗框口的净尺寸,考虑风缝(松动) 的大小,再好进一步确定扇的宽度和高度,并进行修刨。 修刨时,高 度方向,下冒头边略微修刨一下,主要是修刨上冒头边。
料贴上,并用平整木板压在块料上用木锤敲击平正。 C、将挤出的水泥膏及时清干净。 D、块料贴上后,在纸面刷水湿润,将纸揭去(一般待 15~30 分钟),并及时将纸屑清 项目(专业) 技术负责人 交底人 接收交底人 注: 本记录一式两份,一份交底单位存,一份接收交底单位存。 3 技术交底记录 工程名称 九龙园 C 区标准厂房 栋 施工单位 中城北方重庆海丰集团二分公司 交底部位 外墙 工序名称