通信工程专业英语论文翻译内容摘要:

and forty times efficient than analog systems. CDMA also have better security and higher data and voice transmission quality because of the spread spectrum technology it uses, which has increased resistance to multipath distortion. The battery life is higher in TDMA pared to CDMA because CDMA handsets transmit data all the time and TDMA does not require constant transmission. CDMA has greater coverage area when pared to TDMA. Though, when it es to international roaming TDMA is better than CDMA. CDMA is patented by Qualm, so an extra fee is paid to Qualm. When it es to United States and Canada market size for CDMA is larger than GSM’s market size but worldwide the market size for GSM is far bigger both in the number of subscribers and coverage ,than CDMA. Conclusion: From the parisons made above we cannot say that TDMA is better than CDMA or vice versa. The main advantage of the CDMA is that, in the single detection method it is more flexible than TDMA or joint detection. CDMA is。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。