石油工程专业英语-油藏管理技术重点句子reservoirmanagement内容摘要:
能够顶起液柱而使油井自喷。 如果不够大的话,就必须利用人工举升的方法。 17. Natural gas dissolved in oil will e out of solution and form bubbles, which expand as the fluid pressure is reduced. 溶解在原油中的天然气将从溶液中跑出来并形成气泡,这些气泡随流体压力降低而增大。 18. Secondary recovery in solutiongas drive reservoir involves the injection of gas or water to replace produce volumes and thus maintain reservoir pressure. 在溶解气驱油藏中,二次采油涉及到了注水或注气,目的是补充减少的体积并维持油藏压力。 19. The larger the gas cap volume relative to the oil volume, the lower will be the pressure loss in the gas cap for a given amount of oil production. 当产出一定原油时,相对于原油体积而言,气顶的 体积越大,气顶的压力损失越小。 20. Gas or water injection can be utilized to maintain pressure in a gascap drive reservoir, just as it is practiced in a sotutiongas drive reservoir. 随着注水或注气在溶解气驱油藏中的应用,为了维持油藏压力,它也慢慢的运用在气顶驱油藏中。 21. Often it is difficult to determine exactly how much each mechanism contributes to the overall recovery. 通常很难准确确定每种机理对采收率所起的作用。 22. As a relationship between pressure drop and volume changes, the material balance equation is very valuable because it enables one to make an estimate of the original volume of hydrocarbons basedonthe pressureproduction performance. 随着压力降与体积的关系,物质平衡方程式是非常重要的。 基于压力 产量曲线,人们能预测碳水化合物的地质储量。 23. If the reservoir hydrocarbon position is such that the accumulation exists as a gas at reservoir conditions, production of such a gas reservoir is usually a matter of simple gas expansion, sometimes assisted by water influx. Recovery is generally very good, particularly if the bottomhole flowing pressure can be reduced to a minimum, by lowering the backpressure at the wellhead with pressors. In such cases, recovery can be as high as 85% to 90%. 如果储集层的碳氢化合物是包含气体存在,在开发含气油藏时气体膨胀,有时还有水的参与。 采收率在井底流压被降低很小时、在井口回压被压缩机控制的很低时有很大值,在一些情况下,采收率可以高达 85%— 90%。 24. The methods differ in the nature of the fluids used and the physical changes they bring about in the reservoir, but water usually plays a part inhelping to displace the oil. 在以存在的和储层中发生变化的自然流体的研究方法不同,但是水在驱替油时扮演重要的角色。 25. The mobility of any fluid in a porous medium such as reservoir rock is directly proportioned to its velocity or flow and is equal to the effective permeability to that fluid divided by the fluid viscosity. 在例如储层岩石的多孔介质中任何流体的流变形都和它的速率、流态有关,并且按照流体的粘度不同而划分。 26. The mobility ratio is defined as the mobility of the displacing phase in the portion of the reservoir contacted by the injected fluid, divided by the mobility of the displaced case of water displacing oil (waterflooding)。 流度比是有注入流体的储层中取代相流体流动能力所占的比例,在注入水的情况如下面公式。 2。石油工程专业英语-油藏管理技术重点句子reservoirmanagement
相关推荐
( 2)有杆泵采油:由抽油机、抽油杆、抽油泵和其它附件组成。 抽 油机是有杆深井泵采油的主要地面设备,它将电能转化为机械能,包 括游梁式抽油机和无游梁式抽油机两种。 其工作原理是:工作时,动 力设备将高速旋转运动通过减速箱传递给曲柄,带动 曲柄低速旋转 ; 曲柄通过连杆带动游梁作上下摆动; 挂在驴头上的悬绳器通过抽油杆 带动井下深井泵作上下往复运动,把油抽到地面。 抽油泵是将机械能
不扣除简体上的空洞所占面积。 烟罩、箱门盖板、两端管板、带隔热层管板等均按金属重量以“吨”为计量单位。 烟道挡板按其安装位置(炉体、烟囱、烟道)分别按重量以“吨”为计量单位。 (二)炉管及附件安装 炉管安装按不同材质,不同管径 与壁厚,分别按实际重量以“吨”为计量单位。 急弯弯管安装, 区分不同材质,不同管径与壁厚,按 90 度与 180 度两类型式,分别以“个”为计量单位。
第 1条 当脱硫装置(或装置组件)停运,检查、修理和校正等项工作完成后, 要使脱硫装置恢复到备用状态,必须对以下工作进行检验和验证,并保留相应记录。 第 2条 工作完成后,要检查打开的人孔盖有无 烟气泄漏 污染,如有必要进行清理,关好人孔盖,并重新装设好人孔盖处的绝缘垫。 第 3条 工作完成后,要检查打开的的槽罐盖有无污染,如有必要,进行清理,盖好槽盖,关掉底部排水 阀 , 然后充注到运行液位。
减少为“管理手册、管理文件、基层两书一表” 3 层,且油库作业指导书操作部分由新版油库操作规程代替、加油站作业指导书操作部分由加油站管理规范代替, 避免了基层作业文件的重复。 修订后, 管理类文件数量由原有的 105 个减少为 41 个,总记录数由原有的 229 个减少为 133 个,其中电子版记录 47 个,大大优化了体系文件结构,降低了员工劳动强度。 (五)落实安保基金管理制度
② GPC 100 棱镜柱,如图 • 棱镜位置高于轨面约 60cm,以尽量降低大气折射的影响 • 标准的棱镜位置 • 系统组装不会降低测量精度 图 ③索尼工程电脑,如图 图 ④用 LEICA 全站 仪测量绝对坐标 : LEICA TPS1200, 如图 图 ( 2) 利用 TCPS27 无线调制解调器进行远程控制操作,如图 黄河水利职业技术学院毕业设计报告 17 a 轨检小车通讯猫 b
及检查评定表》、(附后)中规定的相关内容。 (四)不予复工复产的煤矿 对存在下列情形之一的矿井,不得通过复工复产验收: 1.所持 “六证 ”有过期的(生产矿井); 2.煤矿企业主要负责人、安全生产管理人员、特种作业人员和其他从业人员未经培训合格,并持证上岗的; 3.井下作业人员未集中培训、考试合格、签定劳动合同的; 4.采掘工作面支护不齐全,未按规定配置监控设备的; 5. 采掘工作面