unitsixthemakingofasurgeon内容摘要:
的。 2) touch。 take up 触 , 摸 Glass— handle with care. 玻璃 — 小心轻放。 The stamp collector washed his hand before handling stamps. 这位集邮者在触摸邮票前都要洗手。 3) operate。 direct。 train 操纵 , 统帅 , 训练 Napoleon is very good at handling troops. 拿破仑非常擅长统帅军队。 This car handles well. 这车开起来真灵便。 After two months’ training, the worker now handles the machine with ease. 经过两个月的训练 , 这名工人现在能 很轻松地操纵这台机器。 n. part of a tool, door, drawer, etc. 柄 , 把手 , 拉手 the handle of a cup 茶杯的柄 the handlebar of a bicycle 自行车的车把 a door handle 门把手 13. anticipate: see beforehand 预期 , 期望 I anticipate having an enjoyable working relationship with you all. 我期望与你们大家建立愉快的工作关系。 Analysts are anticipating a bull market. 分析家们正在期待着一个牛市。 14. inevitably: unavoidably 不可避免地 Death es inevitably. 死亡是不可避免的。 The train was inevitably delayed by the accident. 火车不可避免地受到这事故的耽误。 15. operate: vt. cause to work, control 开动 , 操纵 , 操作 operate a machine/a factory 开机器 /管理工厂 vi. perform a surgical operation 做手术 Have you ever been operated on? 你动过手术吗。 I’ll have to have my stomach operated on. 我将不得不接受胃部手术。 16. sole: one and only 唯一的 His sole wish is to live an undisturbed life. 他唯一的愿望就是过不受打扰的生活。 Drunken driving was the sole cause of the accident. 醉酒驾驶是这次事故的唯一原因。 17. responsibility: 1) being responsible 责任 , 负责 He refuses all responsibilities for the accident. 他拒绝为这次事故负全部责任。 A terrorist group claimed res ponsibility for the suicide bomb. 一个恐怖组织宣称对这次自杀性爆炸负责。 2) duty 职责 , 义务 Every one of us should meet our parentsupporting responsibilities. 我们每个人都应该尽到赡养父母的责任。 It is my responsibility to lock the door. 锁门是我的职责。 18. avoid: escape。 keep or get away from 避免 avoid doing sth. 避免做某事 Nurses spoke in a low voice to avoid wakening the patient. 护士们小声说话以免吵醒病人。 The children were told to avoid speaking to strangers in the street.。unitsixthemakingofasurgeon
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。