船舶管理公司风险评估手册内容摘要:
sk is reduced, the precautions is integrity,well pliance then the assessment is over,otherwise the assessment to be conducted over again untill its meet the requirements. 7 对船舶、人员和环境的所有已认定的风险评估报告 The assessment reports for all identified risk to ships, personnel and the 对船舶、人员和环境的所有已认定的风险评估 To all identified risks to ships, personnel and the environment(table 1) ISM16 章 Chapter 16 按照评估方法,进行一般性风险评估,得到增加、修改完善的文件内容 Carrying out general assessment basis on its method to add and/or amend the SMS documents ISM 7 章Chapter7 按照评估方法,对人员保护方面进行风险评估,得到增加、修改完善的文件内容 Carrying out assessment to personnel protection basis on its method to add and /or amend the SMS documents 按照评估方法,对环境保护方面进行风险评估,得到增加、修改完善的文件内容 Carring out assessment to environmental protection basis on its method to add and /or amend the SMS documents 按照评估方法,对件杂货物运输方面进行风险评估,得到增加 、修改完善的文件内容 Carring out assessment to geneneral cargo transportation related basis on its method to add and /or amend the SMS documents 大连宏洋船舶管理有限公司 DALIAN GRAND OCEAN SHIP MANAGEMENT CO., LTD 编码: SPR090201 风险评估手册 版号 共 61 页 本页修改次数 : 第 6 页 本页修改生效日期: 6/61 序号 Number 基本内容 Contents 细节描述 Descriptions 7 environment 对船舶、人员和环境的所有已认定的风险评估报告 The assessment reports for all identified risk to ships, personnel and the environment 按照评估方法,对大宗散装货物运输方面进行风险评估,得到增加、修改完善的文件内容 Carring out assessment to bulk cargo transportation related basis on its method to add and /or amend the SMS documents 按照评估方法,对集装箱运输方面进行风险评估,得到增加、修改完善的文件内容 Carring out assessment to container cargo transportation related basis on its method to add and /or amend the SMS documents 按照评估方法,对散装化学品运输方面进行风险评估,得到增加、修改完善的文件内容 Carring out assessment to chemical cargo in bulk transportation related basis on its method to add and /or amend the SMS documents 按照评估方法,对货油运输方面进行风险评估,得到增加、修改完善的文件内容 Carring out assessment to oil cargo transportation related basis on its method to add and /or amend the SMS documents 按照评估方法,对旅客运输方面进行风险评估,得到增加、修改完善的文件内容 Carring out assessment to passenger transportation related basis on its method to add and /or amend the SMS documents ISM 8 章 Chapter 8 按照评估方法,对船舶应急应变及演练方面进行风险评估,得到增加、修改完善的文件内容 Carring out assessment to emergency preparedness and dril related basis on its method to add and /or amend the SMS documents ISM 9 章 Chapter 9 按照评估方法,进行一般性风险评估,得到增加、修改完善的文件内容 Carrying out general assessment basis on its method to add and/or amend the SMS documents ISM 10 章 Chapter 10 按照评估方法,对船舶维护保养、修理等方面进行风险评估,得到增加、修改完善的文件内容 Carring out assessment to maintenance of the ship an。船舶管理公司风险评估手册
相关推荐
第十一章 简单机械和功知识归纳 1.杠杆:一根在力的作用下能绕着固定点转动的硬棒就叫杠杆。 2.什么是支点、动力、阻力、动力臂、阻力臂。 (1)支点:杠杆绕着转动的点 (o) (2)动力:使杠杆转动的力 (F1) (3)阻力:阻碍杠杆转动的力 (F2) (4)动力臂:从支点到动力的作用线的距离( L1)。 (5)阻力臂:从支点到阻力作用 线的距离( L2) 3.杠杆平衡的条件 : 动力动力臂
( 3)救生艇舷梯及起货系统布置图 ( 4)桅墙信号布置图 ( 5)机仓及甲板设备底座图 ( 6)全船箱柜、自制设备制造图 ( 7)机仓箱柜附件开孔图 ( 8)甲板机械布置安装图 设计 开工前一个月 12 码头安装及系泊试验 ( 1)机仓各系统管系原理图 ( 2)甲板及 上层建筑各系统原理图 ( 3)全船动力设备、照明原理接线图 ( 4)系泊试验大纲 设计 开工前一个月 施工项目
(六)材料、成品的试验、检测工作内容及方法 试验、检测是工程质量监理的重要手段,试 验、检测资料是评价工程质量的依据。 监理工程师要对工作质量作出公正的评价,就必须通过各种试验、检测、检验获得准确、独立的试验数据。 主要试验项目有验证试验、标准试验、抽样试验、工艺试验和验收试验五大类,下面分别叙述其试验工作内容、试验方法和各项试验的监理工作流程。 验证试验
火势开始蔓延扩大,不可能马上扑灭的,按本预案“ 火灾紧急状态的响应”条款执行。 火灾现场的所属部门按照应急预案进行响应灭火,并视火灾严重情况决定是否寻求外部救援。 火灾紧急状态的响应 任何员工发现火情 ,不论发生在现场还是 车间 ,马上喊 “ 着火了 ” 并立即拨打 项目部 内 部 火警电话“ ”通报火场位置。 项目 部接到火警电话后马上通知应急组织 ,并组织车 辆 人员