建筑类常用英语词汇内容摘要:

ndow 活动百叶窗 adjustable louver 天窗 skylight 老虎窗 dormer window 密封双层玻璃 sealed double glazing 钢筋混凝土过梁 reinforced concrete lintel 钢筋砖过梁 reinforced brick lintel 窗扇 casement sash 窗台 window sill 窗台板 window board 窗中梃 mullion 窗横木 mutin 窗边木 stile 压缝条 cover mould 窗帘盒 curtain box 合页 (铰链 ) hinge (butts) 转轴 pivot 长脚铰链 parliament hinge 闭门器 door closer 地弹簧 floor closer 插销 bolt 门锁 door lock 拉手 pull 链条 chain 门钩 door hanger 碰球 ball latch 窗钩 window catch 暗插销 insert bolt 电动开关器 electric opener 平板玻璃 plate glass 夹丝玻璃 wire glass 透明玻璃 clear glass 毛玻璃 (磨砂玻璃 ) ground glass (frosted glass) 防弹玻璃 bulletproof glass 石英玻璃 quartz glass 吸热玻璃 heat absorbing glass 磨光玻璃 polished glass 着色玻璃 pigmented glass 玻璃瓦 glass tile 玻璃砖 glass block 有机玻璃 anic glass I. STAIRCASE, LANDING amp。 LIFT (ELEVATOR) 楼梯、休息平台及电梯 楼梯 stair 楼梯间 staircase 疏散梯 emergency stair 旋转梯 spiral stair (circular stair) 吊车梯 crane ladder 直爬梯 vertical ladder 踏步 step 扇形踏步 winder (wheel step) 踏步板 tread 档步板 riser 踏步宽度 tread width 防滑条 nonslip insert (strips) 栏杆 railing (balustrade) 平台栏杆 platform railing 吊装孔栏杆 railing around mounting hole 扶手 handrail 梯段高度 height of flight 防护梯笼 protecting cage (safety cage) 平台 landing (platform) 操作平台 operating platform 装卸平台 platform for loading amp。 unloading 楼梯平台 stair landing 客梯 passenger lift 货梯 goods lift 客 /货两用梯 goods/passenger lift 液压电梯 hydraulic lift 自动扶梯 escalator 观光电梯 observation elevator 电梯机房 lift mortar room 电梯 坑 lift pit 电梯井道 lift shaft j. BUILDING MATERIAL WORDS AND PHRASES 建筑材料词汇及短语 Bricks and Tiles 砖和瓦 红砖 red brick 粘土砖 clay brick 瓷砖 glazed brick (ceramic tile) 防火砖 fire brick 空心砖 hollow brick 面砖 facing brick 地板砖 flooring tile 缸砖 clinkery brick 马赛克 mosaic 陶粒混凝土 ceramsite concrete 琉璃瓦 glazed tile 脊瓦 ridge tile 石棉瓦 asbestos tile (shingle) 波形石棉水泥瓦 corrugated asbestos cement sheet Lime, Sand and Stone 灰、砂和石 石膏 gypsum 大理石 marble 汉白玉 white marble 花岗岩 granite 碎石 crushed stone 毛石 rubble 蛭石 vermiculite 珍珠岩 pearlite 水磨石 terrazzo 卵石 cobble 砾石 gravel 粗砂 course sand 中砂 medium sand 细砂 fine sand Cement, Mortar and Concrete 水泥、砂浆和混凝土 波特兰水泥 (普通硅酸盐水泥 ) Portland cement 硅酸盐水泥 silicate cement 火山灰水泥 pozzolana cement 白水泥 white cement 水泥砂浆 cement mortar 石灰砂浆 lime mortar 水泥石灰砂浆 (混合砂浆 ) cementlime mortar 保温砂浆 thermal mortar 防水砂浆 waterproof mortar 耐酸砂浆 acidresistant mortar 耐碱砂浆 alkalineresistant mortar 沥青砂浆 bituminous mortar 纸筋灰 paper strip mixed lime mortar 麻刀灰 hemp cut lime mortar 灰缝 mortar joint 素混凝土 plain concrete 钢筋混凝土 reinforced concrete 轻质混凝土 lightweight concrete 细石混凝土 fine aggregate concrete 沥青混凝土 asphalt concrete 泡沫混凝土 foamed concrete 炉渣混凝土 cinder concrete Facing And Plastering Materials 饰面及粉刷材料 水刷石 granitic plaster 斩假石 artificial stone 刷浆 lime wash 可赛银 casein 大白浆 white wash 麻刀灰打底 hemp cuts and lime as base 喷大白浆两道 sprayed twice with white wash 分格抹水泥砂浆 cemen。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。