基坑土钉支护技术浅析毕业论文外文翻译内容摘要:
nts, should adopt the Hor Hclass steel workers, reinforced after the purchase should be properly safeguarded to prevent corrosion, production should be transferred straight, rust, oil removal, should be carried out physical and mechanical properties or chemical position analysis of test welding of steel, should be weldability and welding quality of the test for detection of welding material strength should be greater than the overall strength。 Cement: ordinary portland cement used, label , if necessary, sulfuric acid resistant cement, alumina cement should not be used. Cement should ply with the provisions of the existing cement standard requirements, there must be a single factory test reports, quality inspection orders, factory card documents, in accordance with its varieties, label, test numbers etc., and inspection and acceptance sampling inspection, by the examination results are reasonableUse. Bags of cement should be properly kept in storage and transportation, rain, moisture, stacked in a certain height from the ground heap shelves, is strictly prohibited and damage throwing throwing bags, prohibited the use of damp or different varieties of mixed cement label. Aggregate: stone and sand material (seeds film, mediumfine sand) should check report cards, the stone test methods and quality standards by JGJ5392, sand material testing methods and quality standards by JGJ5292. Particle size of less than 2mm in the sand, sand, clay content by weight not more than 3%, the particle size of less than 12mm gravel or melon tablets, clay content by weight not more than 3%. Mixing of water: the water without affecting the normal condensation of cement hardening of harmful impurities, may not contain fat, sugar and free acid, etc.。 water, PH value is less than four of acidic water and sulfur ion of more than 1% of the water weight of water were shall not be used。 the use of tap water or clean water for mixing natural water could be dispensed with for testing. Quicksetting agent: quicksetting agent is used in J85, 711, or Red Star 1, should be specifically responsible for control, add the weight of 3% of the weight of cement, the machine automatically added by the jet. Electrodes: The THJ422. Concrete mix: In addition to spraying the concrete mix design standards to be attained strength, we must also meet the technical requirements of construction, with the ratio of 1::2:2 (cement: water: sand: melon pieces), melon seeds piece maximum diameter of not more than 12mm. Grouting mixture ratio: onegrouting with cement mortar 1:1, the second grouting using watercement ratio of water slurry, cement mortar and cement slurry must be stirred evenly pure, a mixing of the slurry must be initial setting before ( generally 2h) run out. Early strength and waterreducing agent: According to the nature of projects, using different types of early strength agent, monly used red star on the 4th, 3F, NC, NNOF, NS21 and so on. Net production of soil nailing and reinforced Size allowable deviation of soil nail making: the length of ??100mm, curved reposted elsewhere in the paper for free download Drainage System Soil Nailing appropriate to remove ground water under the conditions of construction, the drainage should take appropriate measures, including surface drainage, internal drainage, as well as supporting the drainage pit in order to avoid saturation of the soil and reduce the role of the hydrostatic layer on the surface pressure. Excavation around the bracing should be added within the surface finishing, and building drains and cement mortar or concrete surface to the underground water surface infiltration of precipitation. Pit top of the hill near the 24m wide and the ground should be properly boosted, and the inside of high external low, easy to runoff away from the slope. In supporting the back surfac。基坑土钉支护技术浅析毕业论文外文翻译
相关推荐
为原则,以“加强教育、管好党员、带好队伍、定好制度、建好机制、促进发展”为工作目标,以创先争优(原文来自: . 蓬 勃范文 网 :基层党建规范化建设实施方案 )活动为载体,全力推进队伍建设标准化、制度建设标准化、工作流程标准化、阵地建设标准化的“四个标准化”党支部建设。 7 二、领导组织 为全面开展“标准化党支部”创建活动, 并确保取得成效,特成立 XX分公司标准化党支部创建领导小组。 组 长
,坚持以科学发展观统领农业和农村工作,紧紧抓住构建社会主义和谐社会的历史性机遇,抓住多区域开放合作的有利条件,抓住工业化城镇化加快发展的有利时机,把发展现代农业作为社会主义新农村建设的首要任务,精心部署,切实抓紧抓好。 2010年广西农业农村工作总体思路是:深入贯彻落实科学发展观,以统筹城乡发展和建设社会主义新农村为总揽,以增加农民收入为核心,把建设现代农业作为转变发展方式的重大任务
................................................. 101 人民调解案卷定期评比制度 ............................................................................................. 101 人民调解目标管理制度 .......................
两学一做 ”学习教育的重大意义,使广大党员充分认识到开展学习教育的重要性,引导广大党员积极投入到学习教育当中,把它作为解决自身突出问题、转变工作作风、为基层群众服务的有力武器。 提高群众知晓率。 坚持把发动群众参与作为开展 “两学一做 ”学习教育的有力抓手。 一方面,采取问卷调查、上门走访、开展座谈、个别访谈等形式,围绕如何开展好学习教育进行专题调研,广泛听取群众意见建议,通过问计于民
13 2020427 七、 冷缝处理: 本工程工期紧张,根据本进度计划安排在 1- 8 轴线处主楼与二区接头处即 2 号桩机插入时,将会形成冷缝,在 2 号桩基插入开打时在 1- 8 轴线附近新旧搅拌桩同头企口搭接 4m长。 接头部位桩长同主楼搅拌桩(长 8m)若因管桩工程出现意外情况导致其它部位搅拌桩不能连续施工时,形成冷缝也按此方法处理。 八、 机械进场与施工进度安排: 搅拌桩一区主楼部位