高中英语语法总结大全-虚拟语气内容摘要:

,动词 39。 be39。 的过去时态一律用 were,不用 was, 即在从句中 be 用were 代替。 If I were you, I would go to look for him. 如果我是你,就会去找他。 If he were here, everything would be all right. 如果他在这 儿,一切都会好的。 典型例题 _____ to do the work, I should do it some other day. A. If were I B. I wereC. Were ID. Was I 答案 C. 在虚拟条件状语中如果有 were, should, had 这三个词,通常将 if 省略,主语提前 , 变成 were, should, had +主语的形式。 但要注意,在虚拟条件状语从句中,省略连词的倒装形式的句首不能用动词的缩略形式。 如我们可说 Were I not to do., 而不能 说 Weren39。 t I to do. 特殊的虚拟语气词: should 1) It is demanded / necessary / a pity + that… 结构中的主语从句的谓语动词要用 should 加动词原形, should 可省略。 句型: (1)suggested It is(2)importantthat…+ (should) do 嘉兴英语教学网 收集整理 欢迎使用 第 4页 共 6页 (3) a pity (1)suggested, ordered, proposed, required,demanded, requested, insisted; + (should) do (2)important, necessary, natural, strange a pity,a shame,no wonder (3)It is suggested that we (should) hold a meeting next week. It is necessary that he (should) e to our meeting tomorrow. 2)在宾语从句中的应用 在表示命令、建议、要求等一类动词后面的从句中。 order, suggest, propose, require, demand, request, insist, mand, insist + (should) do I suggest that we (should) hold a meeting next week. He insisted that he (shou。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。