石油工程专业英语-钻井技术基础重点句子basicdrillingtechnology内容摘要:
ch as the river deltas of West Africa, the inland waters of the Louisiana swamps, or the shallows of Lake Maricaibo, Venezuela. 显然,这种钻机只能用在相对较浅的,沼泽地区,例如:西非的river deltus,路易斯安 那沼泽的内陆河或者委内瑞拉的 Lake Maricaibor 浅部。 8 17. his rig is a floating deck supported by submerged pontoons and kept stationary by a series of anchors and mooring lines, and, in some cases, positionkeeping propellers. 这种钻机是由水下的浮桥所支撑的浮动的甲板,它被一系列的锚,固定绳,在一定情况下还包括固定的推进器 固定。 18. A “floater” like the semisubmersible, a drillship must maintain its position at the drilling location by anchors and mooring lines, or by putercontrolled dynamic positioning equipment. 一个“浮动物”像半潜入水中的,石油钻探平台在钻井现场必须通过锚,固定绳或者计算机控制的动力位置装置来保持它的固定。 19. Structure rigs are mounted on a fixed drilling and production platform, with all necessary auxiliary equipment secured on the deck. 结构钻机配备有固定的钻井开发平台,和在平台所需的安全辅助设备。 20. Although all of the drilling rigs mentioned vary quite a bit, depending on what sort of surface environment or stresses they are designed for, they still provide us with the ability to perform the four basic drilling functions discussed next. 尽管所有被提供的钻机变化范围相当大,其取决与地面环境的类型和它们设计的重点,但它们仍然提供完成以下讨论的四种基本钻井作用的能力。 21. The kelly and swivel are connected to the drillstring and are suspended from the hook beneath the traveling block, allowing the kelly and drillstring to be turned by the rotary table. 方钻杆和水龙头连接在钻柱上,它们悬挂在游车下面的大钩上 ,大钩另方钻杆和钻柱随着钻盘的旋转而转动。 22. From the drawworks, the line is threaded through the crown block at the top of the derrick and then through the traveling block, which hangs suspended from the crown block (Figure ). 从绞车开始,绳索穿过钻塔顶部的天车,然后通过悬挂在天车下面的游车。 9 23. The wire rope drilling line that is spooled onto the drawworks drum undergoes a certain degree of wear as the block is raised and lowered in the derrick. 随着钻塔上的天车的上升和下放,缠绕在绞车滚筒的绳索钻线承受着一定程度的拉力载荷。 24. Circulation of a drilling fluid to carry cuttings up the hole and cool the bit is an important function of any rotary drilling rig (Figure ). The heart of the circulation system is the mud pump (or pumps), which is (are) powered by the rig’s prime power source, as are the rotary table and drawworks. 为携带岩屑和冷却铅头的钻井液的循环是任何旋转钻机的一项重要功能。 循环系统中的中心是泥浆泵,它(们)正如转盘一样被钻机的原动机驱动。 25. The blowout preventers are a series of powerful sealing elements designed to close off the annular space between the pipe and hole where the mud is normally returning to the surface. 防喷器是系列设计的关闭管路与井眼之间的环行空间饿密封元件,泥泵通常从环室返回地面。 26. Hoisting, rotating, and circulating equipment is supplied with power from a prime power source, usually diesel engines. Engine capacity may range from 500 to 6000 hp, and power may be transmitted to the rig either mechanically or electrically. 举升系统,旋转系统和循环系统是由原动机提供动力,通常是柴油机,发动机容量从 50 马力至 6000 马力,动力以机械载电的形式传送给钻机。 27. The drillstem and drilling fluid are in themselves rather plex portions of the drilling system, and their makeup plays an important role in the efficiency of the drilling operation— that is, getting deeper cheaper! 钻杆和钻机液本身就是钻机系统中相当复杂的部分,并且它们的组合在钻井施工中起着重要的作用,那就是更深,更经济。 10 28. The drillstring, the largest ponent of the drillstem, is made up primarily of lengths of steel pipe to which are welded a threaded “pin” on the bottom end and a threaded “box” on the upper end (fig. ). 钻柱,钻杆中最长的部分,是又原始长度的钢管底端焊接上公扣,上端焊接母扣组成的。 29. There are other specialized tools that。石油工程专业英语-钻井技术基础重点句子basicdrillingtechnology
相关推荐
报告,矿调度室值班要作好电话记录,力求记录准确、完整。 井下相关人员上井后要填写详细的报告,如瓦斯、煤尘、矿压、风速、二氧化碳、水位、涌水量等记录表。 ( 2)监测监控系统(含瓦斯监测监控、水位监测、测水孔监测等)的报告以监测系统记录的数据为准,不得对数据进行修改。 ( 3)预警预防及事故处置措施以矿领导签发的矿调度通知形式下达。 紧急情况时可先执行电话或口头通知
方案是以先进的技术、可行、可靠的施工方法,具有成功的先例经验,能够优质、安全、快速、高效的 完成 工程任务, 以 “质量第一” 、“安全第一” 为首的指导思想作为行动纲领。 施工装备先进,性能安全可靠, 完全满足竖井安装需 求。 针对本工程特点,建立操作性强,运行效率高的质量管理和质量保证体系。 工程进度指标确定,一 要靠 人员的精心组织、充分发辉 施工人员的 经验和操作技能 ; 二要靠
以直观的通过点击地图来取得该区域的视频画面,并且实现报警联动。 在授权的情况下监控中心的管理人员可以随时调用任何区域的实时画面和历史画面,当该区域有突发事件发生时,管理人员可以调出该区域摄像机的画面并进行放大处理,判断是否派出机动人员快速到达该区域,数字录像机记录 报警 画面图像,为事后处理事件提供有力的依据, 事故处理完后,管理人员控制系统复位,使系统重新处于警戒状态。 第三章 系统选型与配置
???? iioi PPP 1 ⑧ 以 iL 处的压力 iP 为起点压力重复第 ② ~ ⑦ 步,计算下一段的 11 深度 1?iL 和压力 1?iP ,直到各段累加深度等于或大于管长 L 时为止。 计算气 液两相垂直管流的 Orkiszewski 方法 本设计井筒多相流计算采用 Orkiszewski 方法。 Orkiszewski 法提出的四种流动型态是泡流、段塞流、过渡流及环雾流。 如图 1
应由施工单位 报检,监理单位组织 有关单位进行验收,并形成验收文件。 工程试样以及材料复验 应 执行 专业工程施工质量验收规范的规定,并 应 符合 本标准 条规定。 工程的 外 观 质量应由 建设、监理、总承包 /施工等单位验收人 员通过现场检查, 共同确认。 检验 批 与抽样方案 检验批可按 同生产条件或作业条件下所生产的单位产品或完成的工序 划分 ; 检验