石油工程专业英语核心词汇内容摘要:

ing/chips Cellar ,大方井 Blowout preventer (BOP) Blow out Blowout Gush Gusher Kick ; Truckmounted rig Tractortrailer Portable rig Mast Jack up ,顶起 Spudding in Spud in Conductor hole Conductor casing Collar Bit Tricone bit Cone ,(锥形)牙轮 Diamond PDC bit (polycrystalline diamond pact bit ) 刚石钻头 Hardness ,硬性 Wear out v. 磨损,磨坏 Peration ;吃入(钻头对岩层) Trip out (钻具) Make a trip 起下钻 Circulate ;流通 Annulus ,环空 Annular Annular mist flow Screen Shale shaker Cave ,塌下 Cave in 坍塌 Crumble ,破碎 Collapse ,倒塌 Overbalance ,正压 Overbalanced drilling Underbalance drilling Particle ,粒子 Mud cake Bentonite ,斑脱岩 Barite Ram ;防喷器芯子 Pneumatic ,风力的;气体的 Pneumatic/air drilling ,空气钻井 Foam Substructure Return line Discharge line Monkey board 平台 Manifold Mud gas separator Desilter Masterbushing Mud house Water tank Doghouse Fuel storage Hose Catwalk Drilling line Vdoor ramp Pipe rack Unit 6 Well Completion Completion ,完成,结束 Productive ,开采的,产油的 Casing Conductor casing Conductor pipe Surface casing Intermediate casing Production casing Scale ,温标;水垢 Mud scale Downhole ,井下 Bottom hole Borehole Wellbore Pile driver Oil string ,生产套管 Oil patch/field Freshwater ,清水,新鲜水 Saline ; Saline water Salinity Pay zone Oil zone Production zone Liner ,尾管 Liner hanger Slip ;卡瓦 Safety slip Slippage effect Production liner Tubing Plug ; ,岩塞,段塞 Slug Packer Corrode ,侵蚀;锈蚀 Corrosive ; Corrosion Slurry Interval ,间距,层段;隔层 Perforate ,穿孔 Perforation Perforated ,带孔的 Perforated pletion Openhole Openhole pletion Barefoot pletion Wirewrapped screen Wirewrapped screen pletion Charge 量 Shaped charges Gravel ,砾砂 Gravel pack Christmas tree Choke ;节流口;油嘴 Workover API standards Drillstem test (DST ) Stimulation ;増注措施 Hydraulic fracture Acidization (作用) Artificial lift Natural flow ,自喷 Additive Friction reducing additive Acid wash Unit 7 Production of Oil and Ga。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。