无损检测磁粉检验工艺规程内容摘要:
tank. Take a 100mL portion of the suspension from the hose or nozzle and allow it to settle for approximately 30 min. The volume settling out at the bottom of the tube is indicative of the particle concentration in the bath. If the bath concentration is low in particle content, add a sufficient amount of particle materials to obtain the desired concentration. If the suspension is high in particle content, add sufficient vehicle to obtain the desired concentration. If the settled particles appear to be loose agglomerates rather than a solid layer, take a second sample. If still agglomerated, the particles may have bee magized, replace the suspension. 6. Magization Procedure Yoke Technique The direct, alternating current electromagic yokes or permanent mag yokes shall be used for localized magization to form a longitudinal magic field. The alternating current electromagic yoke shall have a lifting power of at least 10 lb. () at maximum pole spacing. The direct current electromagic yoke shall have a lifting power of at least 40 lb. () at the maximum pole spacing. The field strength of yokes can be empirically determined 检验介质是具有高导磁率和低顽磁性的细铁磁粉,其尺寸和形状必须易于形成磁粉显示。 应使用宜兴磁通探伤材料公司生产的黑磁粉 HK1400 或 350。 磁悬液的液体介质必须是变压器油、无味煤油或水。 磁悬液的温度和工件表面温度均不得超过 1350F (570C)。 湿磁粉悬浮液的浓度 磁悬液浓度应按制造厂推荐,用沉淀量值验证,务使日常浓度一定。 浓度不当,会大大影响探伤结果。 除制造厂另有规定外,非荧光磁粉悬浮液浓度应为每 100ml 的水平。 槽中磁悬液浓度通常是用ASTM 的梨形离心管测定其沉淀值来确定的,对非荧光磁粉悬液为 芯柱 ( 刻度 )的沉淀柱;在取样以前,将悬浮液在再循环系统中至少流动 30 分钟,以保证所有磁粉的完全混合,否则磁粉可能在油盘滤网和沿槽的壁或底沉淀下来,从软管或管嘴取 100ml 悬浮液并使它沉淀大约 30分钟 ,大管底沉淀的体积 是槽液磁粉浓度指示值;假如磁悬液中磁粉浓度大低,加足够量的磁粉以获得所需浓度;假如磁悬液中磁粉浓度大高,则加足够的液体介质以获得所需浓度。 假如沉淀磁粉表现为松散的团块,而不是紧密的敷层,则应作第二次取样试验,如果还是团块,说明磁粉可能已被磁化,这时需更换悬浮液。 6. 磁化过程 磁轭法 可采用直流的、交流的电磁轭或永久磁轭、来磁化一个局部区域、形成一个纵向磁场。 交流电磁轭的提升力应至少在两极间距离最大时为 10 磅 ( 公斤 )。 经验磁轭式磁场强度可测量它 更多免费资料下载请进: 好好学习社区 ****** Co.,Ltd. 焊缝检验规程 3 Rev.:0 Page:5 of 7 Title: PROCEDURE FOR MAGNETIC PARTICLE EXAMINATION by measuring its lifting power. Direction of magization: At least two separate examinations shall be carried out on each area. The second examination shall be with the lines of magic flux approximately perpendicular to those used for the first examination in that area. The area to be examined shall be restricted to the area which is equal to 1/4 maximum pole spacing on both sides of the line through two poles. The pole spacing shall at least have 1in. (25mm)overlap each time. 7. Magic Field Strength The special carbon steel / copper plate type field indicator is used to verify that an adequate field strength and direction for the surface of part is obtained. If the clear magic particle pattern is shown on the copper plate side of the field indicator, it indicates that adequate field strength is obtained. 8. Examination Requirements Surface Preparation Satisfactory results are usually obtained in the aswelded, asrolled, ascast, o。无损检测磁粉检验工艺规程
相关推荐
若干 材料供应计划 本纤维喷涂保温工程主要消耗如下材料: H18A 保温喷涂纤维棉 及配套专用粘结剂 ,约 吨; 三 技术要求 无机纤维喷涂棉 无机纤维喷涂棉质量要求应符合国家建材行业标准《矿物棉喷涂绝热层》JC/T9092020 和国家标准《绝热用玻璃棉及其制品》 GB/T13350 中的相关内容,主要指标应******************************** 无机纤维喷涂施工方案
酸盐、二氧化铈、五氧化二砷、五氧化二锑及硫酸盐等 属于还原剂的原料主要有碳(煤粉、焦炭粉、木屑)、酒石酸氢钠、氧化锡、二氧化锡、锡粉、酒石酸等 着色剂 使玻璃着色的物质,称为玻璃的着色剂。 着色剂的作用是使玻璃对光线产生选择性的吸收,呈现一定的颜色。 根据着色剂在玻璃中的状态,可将着色剂分为离子着色剂、胶体着色剂和半导体化合物微晶着色剂。 脱色剂 无 色玻璃应当具有良好的透明度。
宣传控烟健康 教育知识,并当场为咨 询者答疑解惑,动员和号召广大居民自觉抵制公共场所和人群聚集地方的吸烟行为。 xxxx 年,我中心针对不同人群累计开展健康教育讲座 x次,大型干预活动 x次,社区咨 询 x次,累计发放宣传折页 xxxx张。 设立戒烟门诊及咨询电话组织医务人员开展简短戒烟技术学习,设立戒烟门诊及咨询电话,对就诊患者进行戒烟 知识宣传,针对吸烟者特别是慢性病患者,劝导戒烟。
个前端变电站根据现场需要安装相应的摄像机 、拾音器,其中可选定点彩色半球摄像机用于对进出变电站人员进行监视,选用一体化彩色摄像机搭配云台,可根据远程管理人员的命令改变摄像机镜头的方位、角度、焦距等,用于对变电站内设备运行情况、现场环境进行监视。 通过摄像机、拾音器采集来的音视频模拟信号接入前端综合监控主机。 音、视频信号处理 音、视频信号传送到前端综合监控主机后进行信号编码、压缩。
. 提高现有监控系统的安全系数。 现有监控系统利用探测器探测目标,监控人员选择实时监控部分图像,监控过程中存在大量的安全漏洞。 升级后的系统利用先进的智能视觉分析技术,安全系数大大提高。 2. 提高现有监控系统的监控效率。 现有监控系统的安保人员紧盯屏幕,时间越长效率越低。 升级后系统主要利用机器监控, 24 小时始终高效。 安宝人员不需紧盯屏幕,只需处理报警事件,工作量大大减少