工艺管道安装方案中英文内容摘要:
and equipment installation/handover Check and clearance of prefabricated pipe sections and fittings Installation piping supports and brackets Piping assembly tack welding Piping welding Piping weld check and NDT Joint inspection of piping installation Piping test, purging (cleaning), tightness removal of piping welding defects Normal piping installation procedure 8 positions in the construction drawings and code identification of the prefabricated piping. Internal checks and clearance should be made again of the pipe sections, fittings and valves with damaged sealing (plastic cap, plastic cloth or block board), and they can only be assembled, connected and welded after they are proved to be in conformity. 合格的法兰、阀门、垫片密封面安装时不得发生损坏,若发生影响密封损坏要立即更换、修复,方可安装连接。 Conforming sealing of conforming flanges, valves and washers should be damaged during installation. Damaged ones affecting the sealing should be replaced or repaired immediately before they can be installed and connected. 法兰连接应与管道同心,应保证螺栓自由穿入,法兰螺栓孔应跨中安装。 法兰平 行度偏差不大于法兰外径的 ‰ ,且不大于 2mm,不得用强紧螺栓的方法消除歪斜。 Flange connection should be eccentric with the piping, and ensure free insertion of the bolt. Flange bolt hole should be installed in the middle. Deviation of flange parallelism is not greater than ‰ of the outsi de diameter and not greater than 2mm. Do not eliminate obliqueness by tightening the bolt excessively. 螺栓紧固件安装,同一连接处同一规格螺栓,安装方向应一致。 螺母紧固后应与法兰紧贴,不得有楔缝,紧固后的螺母与螺栓端面宜齐平。 螺栓宜采用对称拧紧、顺序二 次拧紧或采用对称拧紧、间隔拧紧、顺序拧紧三次拧紧的方法进行紧固。 管道的螺栓和螺母安装时,其螺栓和螺母应涂以二硫化钼油脂、石墨机油或石墨粉。 Bolts of same specifications should be installed at the same connection amp。 should be installed in the same direction. Tightened nuts should be close against the flange, leaving no seam, and should better be flush with the end surface of the bolt. Bolts should be tightened symmetrically and then sequentially, or tightened three times: symmetrically, at intervals, and sequentially. Piping bolts and nuts should be coated with molebdenum disulphite grease, graphite oil or graphite powder before installation. 管道对接接口组对,按焊接要求对管口内外和坡口进行处理,管口组对用平板尺测量,在距管口中心 200mm 处测量平直度,如下图所示 : For piping butt pairing, the interior and exterior of the orifice and the groove shall be treated in accordance with welding requirement. Measure orifice pairing with a flat plate ruler, and measure the straightness at 200mm from the orifice center, as shown in the 9 figure below: 管道对接口平直度测量 Measurement of straightness of piping butt 管道对接平直度测量允许偏差 Allowable deviation for measured straightness of piping butt 管道规格 Piping specification 允许偏差 Allowable deviation 全长允许偏差 Allowable deviation over the entire length DN 100 mm 1 mm ≤ 10 mm DN ≥100 mm 2 mm ≤ 10 mm 管道的点固焊,应等同正式焊接,其焊接工艺、材料和控制应严格执行相应管道的焊接工艺要求 (详见管道焊接 )。 Piping tack welding should be treated in the same way as the final welding, and welding process, materials and control should be strictly in accordance with technological requirement for welding of corresponding piping (refer to piping welding for details). 螺纹连接的管道或管道上的部件,若设计无要求其螺纹接头密封材料均使用聚四氟乙烯带,拧紧螺纹时,不得将密封材 料挤入管内。 If not specified in the design, threaded joints of threadconnected piping or ponents on the pipes should use teflon band as sealing material. When tightening the threads, do not extrude the sealing material into the pipe. 管道连接时,不得强力组对,法 兰、阀门不得用加偏垫、多层垫等方法消除接口端面间隙、偏斜、错口或不同心等缺陷。 For piping connection, do not force any pairing, and do not use inclined washers or multilayer washers for flanges and valves to eliminate defects of joint end face such as clearance, deviation, displacement and eccentricity. 管道预拉伸或压缩应在预拉伸或压缩区域内的固定管架安装完毕,需热处理的焊缝处理合格;预拉伸或压缩区域内支、吊架安装完毕,支、吊架弹簧按设计值压a 200 钢板尺 steel plate ruler 10 缩并临时固定后进行,预拉伸或压缩的数值必须符合设计文件规定。 Piping pretension or pression should be made after the fixing brackets have been installed in the pretension or pression area, weld seams that need heat treatment have been treated accordingly, hangers/supports have been installed in the pretension or pression area, and hanger/support springs have been pressed according to the design value and fixed on an interim base. The pretension or pression values must conform to what is specified in the design document. 管道安装的允许偏差应符合下表规定 : Allowable deviation of piping installation should conform to the table below: 项目 Item 允许偏差 Allowable Deviation (mm) 坐标 Coordinates 架空及地沟 Overhead and ground ditches 室外 Outdoor 25 室内 Indoor 15 埋 地 Embedded in the ground 60 标高 Elevation 架 空及地沟 Overhead and ground ditches 室外 Outdoor 177。 20 室内 Indoor 177。 15 埋 地 Embedded in the ground 177。 25 水平管道平直度 Straightness of horizontal piping DN≤100 2L‰ , 50 DN100 3L‰ , 80 立管铅垂度 Plumbness of vertical piping 5L‰ , 30 成排管道间距 Distance between pipes in a row 15 交叉管的外壁或绝热层间距 Distance between external walls or heat isolating layers of crossed piping 20 压缩机组及机泵管道安装 Installation of the piping for the pressor set and pump 机组、机泵管道安装前,应检查预制管段、管路附件、阀门、垫片及紧固件的规格、材质、等级及管段编号标识与设计图纸一致。 Before installation of the piping of the machine set and pump, check to make sure that the specifications, material and grades of the prefabricated pipe sections, 11 fittings, valves, gaskets and fasteners, as well as the code identification of the pipe sections correspond with those indicated in the drawings. 机组、机泵的管口应将封闭物拆除,清理、检查管密封面,核实机组、机泵管口法兰结构形式、等级同管道法兰相匹配,向上的管口应加镀锌铁皮盲板,防止管道安装时异物掉入机器内部。 Sealing materials should be removed from the tubing ends of the machine sets and pumps. Check the sealing surface of the piping to make sure that structure and grade of the flanges at the tubing ends of the machine sets and pumps match with the piping flanges. Galvanized iron blinds should be fitted onto upward orifice to prevent foreign objects fro。工艺管道安装方案中英文
相关推荐
好“三人行必有我师”,在以后的工作中,我要主动加强和其他部门同事的沟通,通过公司这个平台达到资源共享,从而提高自己的业务水平。 缺乏计划性 在工作过程中,特别是项目开发的施工阶段,由于缺乏计划性,工作目的不够明确,主次矛盾不清,常常达到事倍功半的效果,领导不满意不说,自己还一肚子委屈。 在以后的工作过程中,我要认真制订工作计划,做事加强目的认识,分清主次矛盾,争取能达到事半功倍的效果。
间过长,产酸过多 (3)发酵乳干物质含量低,发酵剂量过大。 风味不良 无芳香味:发酵剂种类单一,需两种菌混合使用,互相协同,产生良好风味。 异味:发酵剂受杂菌污染或原料乳有异味,如丁酸菌污染,产生丁酸发酵 —— 异味。 酸甜度:加糖量的控制。 表面霉菌生长:贮藏条件不良 口感:正常酸奶口感柔嫩、细滑、清香,异常酸奶口感粗糙,主要为原料乳或乳粉质量差造成的。 比较巴氏杀菌乳与酸乳原料杀菌条件的不同
常每人每天可完成的岗位工作量: 电气、控制和自动化设备以及仪器仪表的检验检查 和维修,以及相关的其他工作 工作环境: 户外工作 ; 外地工作; 海外工作; 室内一般办公室所具之环境 工程部自动化工程师岗位职责和岗位标准 2 工作中容易引致的危险,如机器 √ 举重物 高温 √ 高压 √ 毒气 √ 高空工作 其他 强弱电 工作中需接触的部门: 生产部、品质部、 安环部、人力资源部
价款、需扣除的甲供材料款和其他应扣款项以及应付工程款(按合同要求的支付比例),七天内完成。 3. 预算工程师复核后把复核报告提交技术负责人审核。 4. 技术负责人对复核报告以及监理公司的初审报告进行审核并把审核结果报送部门经理,作为工程款支付的依据。 工作流程: 计量部位及依据审查 专业工程师 工程量复核 预算工程师 审核 技术负责人 工程款支付 部门经理 中管网房地产频道 作为国内最大、最专业
量;对所属工程的总体质量情况非常了解,掌握施工中存在的质量问题和整改情况; 组织带动技术员和质检员加强技术、质量管理,能够顺利完成工程的预定质量目标或高于工程预定的质量目标;质量通病能得到根治;所属工程从没有发生过大的质量问题。 1315 A 熟悉国家现行的施工及验收规范和所施工程的质量标准;乐于参与制定各种技术方案,能提出合理化建议;对于公司制定的“过程三检”制度执行的较好,做到质量责任明确
施工 队工作人员不得随 意进入工程部办公 区域,不得私自翻 阅、携取办公文件 。 1 所有施工队人员均 有义务向公司进柬 合理化建议、举报 不良行为。 并有权 直接书面呈报至工 程部经理或工程部 其他相关管理人员 。 第三条: 工程部奖励措 施 1.施工人员所做工程 在一年内无维修奖 励现金 1000 元 。 施工 人员一年内无投诉 奖励现金 500