外文翻译--基于单片机的照明控制系统内容摘要:
de the holedominated, the other side is the Ntype semiconductor, here is mainly electronic. But linking the two semiconductors, among them the formation of a PN junction. When the current through the wires role in this chip, will be pushing eP, P zone in the hole with electronic posite, and then to be issued in the form of photon energy, and this is the principle of LED luminescence. The wavelength of light that is the color of light, is formed by the PN junction of the decisions of the material. LED history 50 years ago, people have to understand semiconductor materials can produce 设计巴巴工作室 light of the basic knowledge, the first mercial diodes in 1960. English is the LED light emitting diode (LED) acronym, and its basic structure is an electroluminescent semiconductor materials, placed in a wire rack, then sealed with epoxy resin around, that is, solid package, Therefore, the protection of the internal batteries can play the role of line, so the seismic performance LED good. LED is the core of the Ptype semiconductor and ponents of the Ntype semiconductor chips, the Ptype semiconductor and Ntype semiconductor between a transition layer, called the PN junction. In some semiconductor materials in the PN junction, the injection of a small number of carriercarrier and the majority of the extra time will be in the form of light energy to release, thus the power to direct conversion of solar energy. PN junction on reverse voltage, a few hardcarrier injection, it is not luminous. This use of injection electroluminescent diodes is produced by the principle of lightemitting diodes, monly known as LED. When it in a positive state of the work (that is, at both ends with forward voltage), the current flows from the LED anode, cathode, semiconductor crystals on the issue from the ultraviolet to infrared light of different colors, light and the strength of the currents. Instruments used for the first LED light source instructions, but all kinds of light colored LED lights in traffic and large screen has been widely applied, have a very good economic and social benefits. The 12inch red traffic lights as an example, is used in the United States have long life, lowefficiency 140 watt incandescent lamp as a light source, it produced 2,000。外文翻译--基于单片机的照明控制系统
相关推荐
JavaBeans 的采用控制翻转( Inversion of Control, IoC)原则的配置管理,使得应用程序的组建更加快捷简易。 一个可用于从 applet 到 Java EE 等不同运行环境的核心 Bean 工厂。 数据库事务的一般化抽象层,允许声明式( Declarative)事务管理器,简化事务的划分使之与底层无关。 内建的针对 JTA 和 单个 JDBC 数据源的一般化策略,使
ogramming language and follow a standard API. Servlets are supported directly or by a plugin on virtually every major Web server. Consequently, servlets written for, say, Macromedia JRun can run
非作业人员进入。 4)拆除时要统一指挥,上下呼应,动作协调,当解开与另一人有关的结扣时,应先通知对方,以防坠落。 5)在拆架时,不得中途换人,如必须换人时,应将拆除情况交代清楚后方可离开。 6)当天拆架下班时,不应留下隐患部位。 7)拆架时严禁碰撞脚手架附近电源线,以防触电事故。 8)所有杆件和扣件在拆除时应分离,不准在杆件上附着扣件或两杆连着送到地面。 9)所有的脚手片 ,应自外向里竖立搬运
写民情登记本 90 份,走访联系群众 360 余人,全面掌握了车管所联系农户的详细资料,实现民警干部受教育、作风改进、发展上水平,群众得实惠。 开展学雷锋活动。 今年 3 月 5 日是第 49 个 “ 学雷锋纪念日 ” ,3 月份以来,车辆管理所认真贯彻全国公安机关深入开展学雷锋活动电视电话会议精神,号召全所民警、职工迅速掀起 “ 学雷锋、当先锋、作表率 ” 的热潮,广泛深入地开展学雷锋活动
验员,负责进行日常的检验工作。 原材料的质量标准和验收办法是以产品技术标准、采购人员、仓库收发保管工作人员均应熟悉质量标准和技术要求。 幕墙材料在购买时均需进行验收检验。 工厂设有专职量检验员,原材料到厂,收货人员收货时,必须会同质量检验员验看材料的质量保证书或制造厂的产品合格证明书,经核对无误后,根据该材料的国家标准或待业标准进行抽检复核,验收合格,方可办理收货手续。 验收不合格的材料