基于at89c51单片机的数字电压表设计外文翻译内容摘要:
Great accuracy. It is not affected by noise. No need for a sample and hold circuit. It has a builtin clock. It has no need for high accuracy external ponents. Schematic (fixed 161109) 7segment display pinout MAN6960 An Analogue to Digital Converter, (ADC from now on) is better known as a dual slope converter or integrating converter. This type of converter is generally preferred over other types as it offers accuracy, simplicity in design and a relative indifference to noise which makes it very reliable. The operation of the circuit is better understood if it is described in two stages. During the first stage and for a given period the input voltage is integrated, and in the output of the integrator at the end of this period, there is a voltage which is directly proportional to the input voltage. At the end of the preset period the integrator is fed with an internal reference voltage and the output of the circuit is gradually reduced until it reaches the level of the zero reference voltage. This second phase is known as the negative slope period and its duration depends on the output of the integrator in the first period. As the duration of the first operation is fixed and the length of the second is variable it is possible to pare the two and this way the input voltage is in fact pared to the internal reference voltage and the result is coded and is send to the display. back side All this sounds quite easy but it is in fact a series of very plex operations which are all made by the ADC IC with the help of a few external ponents which are used to configure the circuit for the job. In detail the circuit works as follows. The voltage to be measured is applied across points 1 and 2 of the circuit and through the circuit R3, R4 and C4 is finally applied to pins 30 and 31 of the IC. These are the input of the IC as you can see from its diagram. (IN HIGH amp。 IN LOW respectively). The resistor R1 together with C1 are used to set the frequency of the internal oscillator (clock) which is set at about 48 Hz. At this clock rate there are about three different readings per second. The capacitor C2 which is connected between pins 33 and 34 of the IC has been selected to pensate for the error caused by the internal reference voltage and also keeps the display steady. The capacitor C3 and the resistor R5 are together the circuit that does the integration of the input voltage and at the same time prevent any division of the input voltage making the circuit faster and more reliable as the possibility of error is greatly reduced. The capacitor C5 forces the instrument to display zero when there is no voltage at its input. The resistor R2 together with P1 are used to adjust the instrument during setup so that it displays zero when the input is zero. The resistor R6 controls the current that is allowed to flow through the displays so that there is sufficient brightness with out damaging them. The IC as we have already mentioned above is capable to drive four mon anode LED displays. The three rightmost。基于at89c51单片机的数字电压表设计外文翻译
相关推荐
private MusicListAdapter mMusicListAdapter = new MusicListAdapter()。 private MainActivity mActivity。 private boolean isPause。 @Override public void onCreate(Bundle savedInstanceState) {
表的启动、保存、翻页查看、停止的功能和数码管的动态显示的功能。 模块框图 本次实训电子秒表所使用到的模块 1. 按 键模块 K0: start 启动, K1: save 保存数据, K2: look 查看数据, K3: stop 停止;将四个按键与 、 、 想接。 通过扫描按键,读取按键实现四个功能的控制。 2. AT89C51 单片机与数码管的显示模块 该部分由两个四段的共阳极 LED
甚至 1uA 以下;使用电压在 3~6V 之间,完全适应电池工作。 低功耗化的效应不仅是功耗低,而且带来了产品的高可靠性、高抗干扰能力以及产品的便携化。 低电压化 几乎所有的单片机都有 WAIT、 STOP 等省电运行方式。 允许使用的电压范围越来越宽,一般在 3~6V 范围内工作。 低电压供电的单片机电源下限已可达 1~2V。 目前 供电的单片机已经问世。 大容量化 以往单片机内的 ROM 为
x82,0xf8,0x80,0x90,0xff}。 /*sbit key1=P1^0。 sbit key2=P1^1。 sbit key3=P1^2。 sbit key4=P1^3。 sbit key5=P1^4。 sbit key6=P1^5。 sbit key7=P1^6。 sbit key8=P1^7。 */ sbit keyzhu=P3^0。 sbit clean=P3^1。 sbit
侮句快兄枝双丸畦寄疙本圈涛邀晴答软兹顶质滨鞍总辅臂南狡氖犊昨竹壮诛明维裙狸苇继偿鸿喳冠牡徽伙菠卤噪府芳荐胺吃赡点 图 单片机最小系统电路图 基于 80C51的八路抢答器的单片机课程设计 20目 录 1 引言 42 总体方案设计 43 硬件电路设计 53. 1 单片机及其外围电路 53. 2 硬件 电路组成 64 系统软件设计 104. 1 初始化程序设计 104. 2 主程序设计 114. 3
04 图 3- 2 霍尔传感器及后续电路图 ⑵ 定时器 控制计数器计算速度 本系统中采用 8253( I) 作为定时器 , 控制计数器 在 一定 时间内 对脉冲 信号进行计数;采用 8253( II)作为计数器,用于在 规定 时间内计算霍尔传感器传来的脉冲信号。 即定时器 8253( I)确定 1s 时间,在 1s 内,计数器 8253( II)允许计数,并将值保存在计数器 8253(