印染废水处理技术综述内容摘要:
gradation products of these anic pounds are relatively less toxic and in some cases, these are almost , polluted water is of almost no use, but if these anic pounds are degraded to smaller fragments, then this treated water may be used for washing, cooling, irrigation and cleaning purposes[1]. One of the heavy metals that has been a major focus in water and waste water treatment is chromium and the hexavalent form of it has been considered to be more hazardous due to its carcinogenic properties [2]. Chromium has been considered as one of the toxic pollutants and because of its carcinogenic characteristics, it has been bee a serious health problem. Extensive use of chromium results in large quantities of chromium containingeffluents which need sufficient treatments[3]. Various methods have been proposed for the treatments of wastewater containing nickel as well as copper in wastewater, such as chemical precipitation, reverse osmosis, ion exchange,electrolysis, adsorption and photocatalysis. Removal of Ni (II) and Cu (II) from wastewater can effectively remove by photocatlysis [4]. Commonly applied treatment methods for color removal from dyecontaminated effluents consist of various processes involving biological, physical and chemical decolorization methods [5]. Conventional treatments of dye effluents include biological oxidation and adsorption. Although less expensive than other approaches, biological treatment is ineffective for decolorization because the dyes are toxic. Adsorption onto activated carbon transfers most of the contaminant from the wastewater to the solid phase. This method therefore requires further disposal of the sludge. In recent years, advanced oxidation processes (AOPs) and electrochemical methods have been developed to treat the contaminants of drinking water and industrial effluents. Advanced oxidation processes almost all are based on the generation of reactive species such as hydroxyl radicals (•OH) which degrade a broad range of anic pollutants quickly and it is claimed that there are other species involved, the active species responsible for the destruction of contaminants in most cases seems to be the hydroxyl radical (•OH) which is unstable and quite reactive. Due to the instability of •OH radical, it must be generated continuously ―in situ‖ through chemical or photochemical reactions[6]. Common AOPs involve Fenton, Fentonlike, photoFenton39。 s processes, ozonation, photo chemical and electrochemical oxidation, photolysis with H2O2 and O3, high voltage electrical discharge (corona) process, TiO2 photocatalysis, radiolysis, wet oxidation, water solutions treatment by electronic beams or γbeams and various binations of these methods [711]. Compared with other oxidation processes ,processes using Fenton type reagent are relatively cheap, easily operated and maintained [12]. Fenton prpcess, one of the most effective processes for the removal of anic pollutants from aqueous solutions [1315], involves the application of ferrous salts and hydrogen peroxide to produce hydroxyl radical according to the following scheme of reactions [16]: Fe2+ + H2O2 → Fe3+ + OH– + •OH (1) Fe2+ +•OH → Fe3+ + OH– (2) Fe3+ + H2O2 → FeO2H2+ + H+ (3) FeO2H2+ → Fe2+ + •O2H (4) Fe2+ + •O2H → Fe3+ + •O2H (5) Fe3+ + •O2H → Fe2+ + O2 + H+ (6) H2O2 + •OH → H2O + •OOH (7) Dye degradation: Dye + H2O2 → Intermediates +H2O (8) Dye + •OH → Intermediates (9) Intermediates + H2O2 → CO2 + H2O + Degradation Products (10) Intermediates + •OH → CO2 + H2O + Degradation Products (11) When a Fentonlike reagent is used, the sequence of reaction begins with reaction (3). There are many bibliographic sources which report that Fenton reagent is more effective than Fentonlike reagent[17]. Due to slow dissociation rate in the dark, the generation of hydroxyl radicals was reduced. It is obvious that the most effective AOPs for treating dye solutions is a UVenhanced H2O2/Fe2+ and H2O2/Fe3+ solutions [18]. The high removal efficiencies of this method can be explained by the fact that oxidation reaction are coupled to coagulation occurring due to the presence of ferrous/ferric cations, thus these metallic ions play a double role as a catalyst and a coagulant in the process. Moreover, in the Fenton process the hydrogen peroxide reacting with ferrous ions forms a strong oxidizing agent (hydroxyl radical), whose oxidation potential is higher than that of ozone ( Vpared to ). In Fentonlike reaction, ferric ions react with H2O2 to produce ferrous ions at very slow rate (k= – M–1s–1) few ferrous ions can be formedand thus induce the Fenton reaction. Therefore, only one process with Fe3+/ H2O2 reaction will dominate[19]. In this study, UV irradiated Fenton reagent (photoFenton process) and also UV irradiation Fentonlike reagent (photoFentonlike process) were applied for the minimization of anic content of colored synthetic wastewaters. Reactive azo dye, C. I Reactive Red 12 with azo chromophore was used as model anic pollutants. Investigations were carried out in order to establish optimal operating conditions,( pH , concentration of dye ,concentration of H2O2, and concentrations of Fe +2 and Fe+3 ions) for the degradation of study dye in model colored wastewaters. MATERIALS AND METHODS Series of experiments were conducted in order to find optimal conditions for study the photodegredation of reactive textile dye from wastewaters. The sample of reactive textile dye . Reactive Red 12 (Cibacron BrilliantRed BA ) with azo chromophore from (CIBA Geigy), was used as model pollutant . Their structures is depicted below : Other reagents namely, hydrogen peroxide ( 30% w/v ), FeSO4 .7H2O , Fe2(SO4)3 . 9H2O, NaOH and HCl were of grad from Merck . The effect of initial pH on treatment efficiency of azo dye was investigated. This was done。印染废水处理技术综述
相关推荐
现场进行射线检测时应结合工作场合实际情况在探伤现场方圆 100米范围内划定控制区和管理区并设置警告标志,夜间还应设有红灯,检测作业时,应围绕控制区边界测定辐射水平,以确定所划定控制区和管理区的有效性 【 4】。 X 射线检测时,控制区可适当放宽,但必须符合 GB16357 中有关规定。 检测作业时,工作人员必须佩带个人剂量计,并携带计量报警仪。 【 5】 .11 暗 室处理 ( 1) 准备工作
为了在竞争中占据有利地位,客户关系管理维护刻不容缓。 研究现状 最早发展客户关系管理的国家是美国, 在对客户关系管理的研究中,国外很多企业走在我国 的前面。 自从 Gartner Group正式提出这个概念以来,不同的研究学者一直都在探讨CRM有着不同的表述,甚至在一些细节方面还存在分歧。 年份 总计 外国人 港澳台同胞 2020 2020 2020 2020 第 6 页 共 16 页
转位 三 面 刃 铣刀,专用夹具和游标卡尺。 ( 2)钻 扩铰 孔 2—Φ10F9 孔口倒角 l45176。 ,钻孔 4 一 Φ13mm 选用摇臂钻床 Z3025。 选用锥柄麻花钻;锥柄扩孔复合钻,扩孔时倒角;选用专用夹具、快换夹头、游标卡尺及塞规。 ( 3) 粗铣 Q 面和 R 面 采用功率为 11kW 的 1TX b20M 型铣削头组成的卧式双面组合机床。 参考文献表21263
留入历史数据库,以供趋势分析、统计计算用。 历史数据采样频率及存储期限用户可自己设定,根据需要还可以进行转储、备份。 报表功能 : 根据实际需要组织报表格式、数量及打印时间。 可以自动或在线生成日报、月报、年报等各类报表。 可随时打印,也可设置打印时间,到时自动打印。 提供历史报表召唤、打印。 棒图、 趋势图显示 : 可随意在线组织棒图、趋势图,可以是电压、电流、功率等模拟量
,选 6mmhp 。 已知条件 工作台重量 95kg 950 NWg 步距角 /setp 滚珠丝杠基本导程 0 6mmL 行程 6mmS 脉冲当量 m m /p setp 本科毕业设计说明书( 论文) 第 14 页 共 35 页 快速进给速度 max 4m / minV 切削力计算 由《机床设计手册》可知,切削功率 cp p k 式中 p —— 电机功率
和神秘感,通过引导学生自己动手实践,在实践中合作学习,理解学习中的重点和难点。 2020 年 9 月 1 日 教 学 进 度 2020~ 2020 学年度(第一学期) 科目:信息技术 年级:四年级 周 次 日 期 内 容 完成 时间 备注 1 2 9 月 1 日~ 9 日 认识信 息处理工具 1 3 12 日~