电子信息工程毕业论文范文下载内容摘要:

multichannel analog switch time transmission,monitoring and control through the Livestock and poultry,and substations,such as analysis,and PC in the PC show up,it will be convenient to all depot staff realtime understand of the situation. Fan grain can adjust the temperature and humidity, not human control,to ensure accuracy. The system has three major ponents: the granary monitoring systems, substation system,PC host puter system. Through management to achieve at all levels of classification of the Livestock and poultry of all singlechip temperature and humidity sensor information analysis and processing, and host puter system to achieve the overall control. Granary system to achieve the automation of largescale monitoring. 目录 引言 防潮、防霉、防腐是畜禽舍日常工作的重要内容,是。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。