sh3510-2000石油化工设备混凝土基础工程施工及验收规范英文版内容摘要:
turned to installation, its axis, elevation and value of elevation shall be marked. — 9 — 3. Form panel, steel reinforcement and concrete works Formworks The installation scheme, as well as type, size and quantity of form panel shall be selected according to the construction drawing. The form panel shall be cleared and repaired before it is used. During installing the form panel, the joints shall be pactive. The contacting surface between the form panel and concrete should be coated with insulating agent before they are used. The partial form panel of foundation reached above of ground shall be coated with the insulating agent that is no pollution to concrete surface. During installation of the form panel, the foundation axis and outline shall be prepared on the concrete mattress or base plate. During install the column form panel on the frame foundation, the clean out shall be prepared at the bottom of the column form panel. The operating hole shall be prepared in each 2m of shaft of column form panel. During the construction of steel formwork, a form panel can be removed as a clean out or an operating hole where it is necessary. Where the section of structure is small, the steel reinforcement is dense, or the operation is difficult, the through operating hole shall be set, which the form panel shall be sealed while grouting concrete. The counterdraw bolt of M12 shall be set on both sides of form panel of walltype foundation. The space of counterdraw bolt can be laid by calculation, or according to the following table . Table Space of Counterdraw bolt Layout Side pressure of concrete( kPa) Space of counterdraw bolt (mm) ≤ 20 ≤ 40 ≤ 60 If there are trenches for pipeline in the equipment foundation, during the installation of form panel of foundation, the precast concrete trench can be installed on the shaped steel supports and can be casted in place with the foundation concrete. The form panel and supports can be removed according to the following regulations, if — 10 — it is not required in design. 1) When removing the form panel, the strength of foundation concrete shall not be less than the parameters stipulated in the following table . Table Strength of Concrete of Foundation during Removing the Form Panel No. Type of structure Span of structure (m) Percentage of designed strength (%) 1 Panel (bottom form) ≤ 2 50 2~8 75 2 Beam (bottom form) ≤ 4 75 4 100 3 Cantilever beam (bottom form) ≤ 2 75 2 100 4 Block foundation — 40 2) The procedures of removing form panes shall be in reverse to the order of its installation. In general, firstly the side form panel shall be removed, then the bottom form panel shall be removed。 firstly the column form panel shall be removed, then the beam and platform form panel shall be removed. Steel Reinforcement Works If any phenomena of brittle rupturing, poor welding or abnormal mechanical performance occur during the processing of steel bar, the chemical analysis or special examination shall be adopted. If the grade and diameter of steel bar that are different from their design, their replacement shall be approved by the design unit, if necessary. The joints of steel bar shall be welded. The method of buttwelding will be provided for the steel bar with more than 22mm of diameter. The welding of steel bar shall conform to the regulations on the JGJ18 “Rules of Steel Bar Welding and Acceptance ”. Where the power equipment foundation may be heavily shocked, the method of welding joints shall not be adopted to connect the steel bar. Before installation of steel reinforcement, the batching list and plate of reinforcement shall be checked according to the construction drawings. As for the frame foundation, if the preembedded bolt is contacted with the steel bar at the connecting place of beam and column, it is necessary to ensure the installation of bolt in — 11 — correct position, or ask for the design unit. As for the laminated place of the hook and hooped reinforcement of beam or column, the hook and hooped reinforcement shall be staggered along the forced direction of reinforcement. In the laminated place of the hook and hooped reinforcement of beam, the hook and hooped reinforcement shall be alternatively placed between the two erected steel bars. In the laminated place of the hook and hooped reinforcement of column, the hook and hooped reinforcement shall be alternatively placed at four corners of main reinforcement. The hooped reinforcement of beam or column shall be perpendicular to the main reinforcement. The hook and hooped reinforcement shall be made with angle of 135176。 . Where there are two meshes of up and down in the foundation reinforcement, the steel bar and shaped steel can be made into the supports to locate the up mesh of steel reinforcement. The thickness of concrete cover for steel bar shall conform to the regulation on the GB50204 “Specification for the Construction and Acceptance of Concrete Structure Works”. The tolerance deviation for the concrete cover shall conform to the table . Table Tolerance deviation for the thickness of steel reinforcement cover (mm) No. Items Tolerance deviation 1 Foundation 177。 10 2 Column beam 177。 5 3 Panel wall 177。 3 The galvanized iron wire used for colligating the steel reinforcement shall conform to the following regulations: 1) iron wire with diameter of mm is suitable for colligating the steel reinforcement with diameter of 12 mm. 2) iron wire with diameter of mm is suitable for colligating the steel reinforcement with diameter of 12—25 mm. 3) iron wire with diameter of mm is suitable for colligating the steel reinforcement with diameter of more than 25mm. The minimum length of galvanized iron。sh3510-2000石油化工设备混凝土基础工程施工及验收规范英文版
相关推荐
21及 IEC603323要求。 产品结构 光缆结构: 束状松套 管 ,圆形结构; 弯曲半径:静态 10D;动态 20D 线缆外 径: 12 芯主干光缆外径 ; 护套类型: LSZH,防火阻燃符合 IEC603321 和 IEC603323C; 执行标准 IEC617547 TIA/EIA6045 产品应用 SIMON Fastamp。 Easy MPO 高密度光纤系统 解决方案 色序 : (
稳定性的需求。 同时还 是“ 国家 IPsec VPN标准 ”的制定者之一”得到了上万家客户的认可,在许多全国性的 IPsec网络上,如中国人寿的网络,深信服科技每天承担着上千万的业务数据传输。 ? 确保数据传输的安全可靠。 公司总部 与 下属 各 分支 之间,通过 Inter,无需更改原有的网络结构、按照实际的运作流程,构建完善、稳定、高效的 VPN网络,保障信息化系统的日常运行。 ?
根据线路层的多少分为:双面板、多层板。 双面板指 PCB 两面有线路,而多层 SMT新员工培训手册 目 录第一章:品管系统简介 1 第六章:工作要领 32第二章:料件的基本知识 进料检验( IQC) 32 PCB 2 6. 2 皂改隘污忆喂雇 浅赘码巧牌帝姐焦器恳诧类担艰栋画臂浑按俄肝混鼓薛毁碉愉犁暇凳骂好础倾涝姑握甲期羚饭弥八咕赣般蹭狡各硕犀慑娟尘李副优 板除 PCB两面有线路外
值应等于或接近计算模型 1 的高度 H1,且不大于 H1。 (3)当转换层设置在 3 层及 3 层以上时,除了采用 “ 等效侧向刚度法 ” 来计 算转换层上下层结构的刚度外,还应按照 “ 层剪力与层间位移之比 ” 的方法计算,并使转换层本层的侧向刚度不应小于转换层相邻上一层侧向刚度的 60%。 当底部大空间层数为 2 层或 1 层时,该控制值可取 50%。 此外
若出现故障情况, PLC 将跟踪连锁,并将相应的状态 输入 DAS 系统。 测量 /校准 指气体分析仪的工作状态, 通 常情况下气体分析仪( U23)应处于测量 状态。 零点校准:零点 校准是一个自动校准过程,不需外部 干预。 它包括通入零点气(空 气)和测量气两个过程。 两个过程时间( purging time)出厂设置为 240s,通零气(空气)时, U23 发出“零气阀”信号,由 PLC