updateonthecurrentstatusofdg内容摘要:

ng + Ferroresonance Loss of Coordination +Choice of Grounded Interconnection Transformer Primary Winding. CLEMSON UNIVERSITY DG CONFERENCE Typical 4Wire Distribution Feeder Circuit Poletop transformer rated for linetoneutral voltages example: KV 3  KV DG CLEMSON UNIVERSITY DG CONFERENCE Ungrounded Interconnection Transformers Problems Advantages Can supply the feeder circuit from an underground source after substation breaker A trips causing overvoltage Provide no ground fault backfeed for fault at F1 amp。 F2. No ground current from breaker A for a fault at F3. Low Voltage (SEC.) High Voltage (PRI.) DG CLEMSON UNIVERSITY DG CONFERENCE Grounded Primary Interconnection Transformers Problems Advantages No ground current from breaker A for faults at F3( ). No overvoltage for ground fault at F1. No overvoltage for ground fault at F1. Low Voltage (SEC.) High Voltage (PRI.) Provides an unwanted ground current for supply circuit faults at F1 and F2. Allows source feeder relaying at A to respond to a secondary ground fault at F3( ). DG 2 3 CLEMSON UNIVERSITY DG CONFERENCE FERRORESONANCE NEW YORK FIELD TESTS –1989 FIELD TEST CIRCUIT CLEMSON UNIVERSITY DG CONFERENCE FERRORE。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。