unit27thepastandthefuture内容摘要:

sense of humour 幽默感  We both laugh at stupid things. laugh at 嘲笑 , 漠视 , 因 ...发笑 Session II  My aunts and uncles lived in the same village and so did my 们住在同一个村庄 ,我的表亲也一样 . 倒装句  I used to see them almost every day. 我过去差不多每天都看到他们 . used to do sth. 过去常常做某事 My mum is English and she wanted to live in London, so we moved. 我妈妈是英国人 ,她想在伦敦居住 ,所以我们就搬家了 . so 在这里表示结果 他的电脑坏了 ,所以他很生气 . There was something wrong with his puter, so he was angry.  It was so different from Sicily. so 表示程度 ,如此 ,那么 be different from 与 … 不同 , be the same as 与 … 一样  Sicily was a beautiful place to grow up in, and life was ,适宜孩子成长 ,那里的生活节奏缓慢 .  We only had a small garden rather than a ,谈不上农场 .  I’ve lived in England now for almost 30 years. 我现在在英语住了差不多有三十年了 . for+时间段 , since+时间点 for an hour。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。