topoisomerasetypeiistructures内容摘要:

(via bending) • This bending provides a means to decatenation and relaxation • Preferred binding sites @ highly curved DNA crossovers and loops in vivo probably arise from intrinsic deforms DNA Berger amp。 Dong 2020 Model • Summary • Conclusions • Impact • Limitations • Comparison to Previous Models – Berger et al Model 1996 – Rybenkov et al Model 1997 – Vologodskii et al Model 2020 Berger and Dong 2020 Model Limitations • Only a portion of Topo II was examined – Fragment used was ~720 aa long (residues 4081177) • Experiment performed in vitro • Model anism used was S. cerevisiae, or yeast (is structure/binding/bending conserved with other anisms? Berger amp。 Dong 2020 Model • Summary • Conclusions • Impact • Limitations • Comparison to Previous Models – Berger et al Model 1996 – Rybenkov et al Model 1997 – Vologodskii et al Model 2020 Berger Model 1996 • One of the researchers of Dong/Berger model published a report on the Structure and Mechanism of Topo II 12 years ago • The Topo II examined was also S. cerevisiae of similar size to 2020 model • In 1996, researchers thought conformation changes occurred after passage of Tsegment, not upon binding of Gsegment • Bending of DNA upon binding with Topo II was not detected 1996 cartoon 2020 cartoon Rybenkov Model 1997 • This study didn‘t specifically look at the structure of Topo II, but it examined implications of its mechanism • Rybenkov et al concluded that Topo II doesn‘t simply catalyze the passing of one DNA strand through another, changing its local conformation and topology, but it controls the global property of DNA as well • Suggested Topo II catalyzed the passage of one strand through another if resulting crossing angles were favorable • Suggested Topo II shortened DNA • Topo II binds three (3) DNA segments (crossover plex) Top2 bound to crossover Vologodskii Model 2020 • This study attempted to use its model to explain previous experimental data • Computer Analysis of enzyme performed – Discrete wormlike chain – Monte Carlo procedure simulated possible DNA conformations – Found that simplification of DNA topology by Topo II not pos。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。