statusofrthtokyo内容摘要:
Seoul Melbourne Washington Washington Melbourne 192kbps 64kbps 64kbps Frame Relay (FR) Networktowork Interconnections 128kbps Seoul Khabarovsk 64 kbps Dedicated line connections BT FR Network (Cloud I) Mbps 256 kbps Mbps Improved MTN (Two Seamless Networks) 1Mbps 2 Mbps Hong Kong Bangkok OBS MPLS Network (Cloud II) MTN • All links are being operated on TCP/IP basis. • Six of nine are IP over Frame Relay. • Two of nine are MPLS. New Delhi Beijing Regional Telemunication Hub (RTH) Tokyo Manila KDDI FR Network CAT FR Network PCCW FR Network DACOM FR Network 64kbps PLDT FR Network 128 kbps Regional circuits 3. Traffic status of the TokyoWashington link CIR=32kbps CIR=768kbps Tokyo FR Washington 1160 Mbytes/day 26 Mbytes/day 4. Traffic status of the TokyoMelbourne link CIR=16kbps CIR=32kbps Tokyo FR Melbourne 256kbps 183 Mbytes/day 157 Mbytes/day 5. Traffic status of the TokyoBeijing link Tokyo MPLS B。statusofrthtokyo
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。