pcetrafficengineeringdatabaserequirements内容摘要:

the IGPTE  Interdomain – ASBR of the foreign domains – Interdomain Links TE – Traffic Engineering performance between Border Nodes (n) – To give performance indication on foreign domain n – But only as an abstract view (to not divulgate details of the work) – PCE (i) peer address associated with the AS number of the domain (i) TED Population  Some mechanisms and protocols have been identified for Intradomain population – Some efforts are necessary for the Interdomain section  Intradomain – IGPTE (ISISTE or OSPFTE) are monly used。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。