jacqueslacanelizabethbishop内容摘要:

text (its differences from and relation to the signs around it). Transcendental signifier: absolute sign whose meaning(s) does not change in its context. (chap 3: 158。 chap 4: 174) Gender Difference Lacan‘s analogy of the restroom signs: (chap 4: 17172) 1. Arbitrary meaning structure determine gender difference 2. Slippery chain 3. It speaks man Phallus vs. Woman as Other (chap 4: 17273) In the Symbolic Order, phallus = wholeness and power。 wholeness  hole, in fact, nobody owns the phallus/power. Women as Lack, or ‗Other‘ which can move outside of language and be in ―jouissance.‖ the unconscious structured like language supported by F‘s view of repression (ideas repressed as codes) evidence from Freud‘s language of Dream (condensation, displacement, symbolization)。 S/s : / = the barrier between the conscious and the unconscious, which resists being represented。 / = the phallus. We are conditioned by the Symbolic order.  movement of our desire –like metonymy. (Cf. chap 4: 172) Insatiable Desire: Need, Demand, and Desire (1) (chap 3: 158) A child develops from need to demand and desire.// its movement from the Real, to the Imaginary and Symbolic. Need – requirements for brutal survival. (biological need)  absence of the mother  the baby‘s social, imaginary and linguistic functions evolve. the Real the Imaginary The Symbolic need demand desire Effects of the three orders: Need, Demand, and Desire (2) Demand: need formulated in language. Demand has two objects: one spoken, the other unspoken. verbalization of imaginary subjectobject, selfother relations. 66 (Grosz pp. 59 67) Desire: primally repressed wishes [for the Mother] reappear in and as unconscious desire. insatiable。 characterized by lack (of object). (Grosz pp. 59 67) Desire: expressed as Demand of Different Objects The connection of the desired object and the demanded: metonymic connection = whole and parts, or continguity (鄰近 ). () : maintenance of the bar Questions III 1. Do you agree with Lacan。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。