conceptsoffuturesstudies有关期中考:文中加底线部份为内容摘要:
5. The study of the ethical foundations of futures studies 11/30/2020 8 Nine major purposes of futures studies, “Qamp。 A” 6. Interpreting the past and orientating the present 7. Integrating knowledge and values for designing social action ( see p16~19) 8. Increasing democratic participation in imaging and designing the future 9. Communicating and advocating a particular image of the future 11/30/2020 9 Why many fields need futures studies? 1. “In facts, one of the reasons that futures studies is needed is precisely for the purpose of improving the wisdom of human decision making and the effectiveness of human action by means more selfconscious and adequate futures thinking.”, p70, [1] 11/30/2020 10 Is futures studies a field? 1. “Because of its diversity, it may be more correct to call futures studies a multifield or transdisciplinary field, rather than a field.”, p71, [1] 11/30/2020 11 As other fields, futurists make predictions. p112, [1] 1. “Rather, the purposes are more plicated and more farreaching than mere prediction and involve the construction and evaluation of alternative futures for the purpose of increasing human control over the future.” 2. “Rather, futurists’ predictions (forecasts, projections, prophecies, etc. whatever they are labeled) are usually multiple, conditional (以 ...為條件。conceptsoffuturesstudies有关期中考:文中加底线部份为
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。