copyrightlawronaldwstaudt内容摘要:

copyright protection in the preexisting material. Compilations– In Out Wainwright Roth – (total concept amp。 feel) Atari Breakout Furniture arrangement CCC Red Book Rural’s white pages SemTorq sign set (132) Boston T shirts(13435) West cases amp。 page numbers ATC and Southco part numbers Bell South Yellow pages Assessment Technologies v. WIREdata Why is J. Posner appalled? Towns hire Assessors who gather tax data Market Drive database 34 categories 456 fields Assessors input data into Market Drive Defendant WIREdata demands data from the towns. Three towns say no because it would violate their MarketDrive software license. Everybody sues. Assessment Technologies v. WIREdata Does AT have a valid copyright? What does that copyright protect? Directive 96/9/EC and the sui generis right? Sporaco v. Lawler Facts Who is Sporaco? Who owns his plans? What is in the plans? What is Sporaco’s claim? What happened in the District Court? Are maps copyrightable? If so what is protected? Sporaco v. Lawler Existing site plan and the fact/expression dichotomy— Selection, coordination, arrangement amp。 pictorial graphical contribution. SJ process. Proposed site plans and idea/expression dichotomy— Abstractions test? Details? Maps and 169。 Sweat of the brow and the framers? How do you advise a client to enhance the copyrightability of a proposed map? What about mileage tables derived from creative copyrightable maps? Compilations– In Out Wainwright Roth – (total concept amp。 feel) Atari Breakout Furniture arrangement CCC Red Book All of Parker’s poems Sporaco’s proposed site plan Rural’s white pages SemTorq sign set (132) Boston T shirts(13435) West cases amp。 page numbers ATC and Southco part numbers Bell South Yellow pages Assessor data in AT Sporaco’s existing site。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。