chapter5determinationofmoisture内容摘要:

then water in samples is vaporized. The loss of weight is moisture content of samples.  Applying range: There is no other volatile materials besides water. furthermore, the sample is stable when heating. For samples containing above 16% moisture  Twostage drying method: A sample is first allowed to equilibrate with the air. A subsample is then ground for the determination of the remaining moisture. Vacuumoven methods  Principle: water’s boiling point is decreased under vacuum.  Applying range:: samples who are easily degenerative when heating above 100℃ , such as fruits, vegetables, syrup, etc. 2. Distillation methods  Distillation with an immiscible solvent under a refluxingtype of condenser.  The mixture of water a。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。