chapter6coulometry内容摘要:
Cu2+分离 控制电位电解法 实际分析中,工作电极(通常为阴极)的电位是随着电解过程的进行而不断变化的,而且阳极电位及电解电流也是可变的。 因此,凭借控制外加电压来控制阴极电位,从而进行分离存在一定的困难。 通常通过下列装置来控制阴极电位。 Potentio meter Electromagic stirrer Reference electrode 167。 63 Controlled Potential Coulometry Coulometer Potentiometer Apparatus setup of controlled potential coulometry is the same as controlled potential electrolysis. Because coulombic analysis is carried out by determining the coulomb passing an electrolytic cell during electrolyzing, an serieswound (串联) accurate coulometer is necessary. Coulometer (库仑计) ■ Silver Coulometer (weight Coulometer) Netty Pt cathode Pt wire anode AgNO3 solution On cathode: Ag+ + e → Ag On anode: 2H2O 4e→O 2 + 4H+ 库仑计本身也是一种电解电池,可以应用不同的电解反应来构成。 ● Titration Coulometer ● Gas Coulometer (hydrogenoxygen Coulometer) 1 2 , 2. electrodes Electrolysis solution: K2SO4 or Na2SO4 Cathode: 2H2O +2e→2OH +H2 Anode: 4OH +e→O 2 + 2H2O of mixed gas of H2 and O2 is ob。chapter6coulometry
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。