chapter10atomicemissionspectrometry内容摘要:
ing long enough (a few seconds) at each to obtain a satisfactory signaltonoise ratio. multichannel instruments (多通道仪器 ) are designed to measure the intensities of emission lines for a large number of elements (sometimes as many as 50 or 60) simultaneously. 14 10A4 application of plasma sources Plasma sources are rich in characteristic emission lines, which makes them useful for both qualitative and quantitative elemental analysis. 15 Calibration curves Calibration curves for plasma emission spectrometry most often consist of a plot of the output current or voltage of a transducer as a function of analyte concentration. When the range of concentrations is large, loglog (p243) plots are employed instead. 16 10B emission spectroscopy based on arc and spark sources Arc and spark source spectroscopies were the first instrumental methods to bee widely used for analysis. Arc and spark sources still find considerable use in qualitative and semiquantitative analysis but have been largely displaced by plasma methods when quantitative data are required. 17 18 In arc and spark sources, sample excitation occurs in the gap between a pair of electrodes (P246: figure 1016). Passage of ele。chapter10atomicemissionspectrometry
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。