askillofwriting内容摘要:
it with the skills that I have learned in this period – connecting sentences, using different sentence patterns. This morning, I got up and looked out of the window. I found it was snowing outside. I was attracted by the sight, so I decided to go out to take some photos. When the snow stopped, I went outside with my camera. I walked on the path in front of our building. I saw a boy slip on the ground. At that moment, I realized what I should do. I ran back home to get a broom and started to sweep the path. I worked hard and sweated a lot. An hour later, the snow was cleared away. I looked at the path. My neighbors all smiled and praised me. I felt very happy. I did something for my neighborhood. This morning, I got up and looked out of the window. I found it was snowing outside. I was attracted by the sight, so I decided to go out to take some photos. When the snow stopped, I went outside with my。askillofwriting
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。