毕业论文英文翻译---电气工程及自动化精品内容摘要:
input power. G、 Overtemperature protection Switching regulator and the high level of integration of lightweight small volume, with its unit volume greatly increased the power density, power supply ponents to its work within the requirements of the ambient temperature is also a corresponding increase. Otherwise, the circuit performance will deteriorate premature ponent failure. Therefore, in highpower switching regulator should be set up overtemperature protection. Relays used to detect the temperature inside the power supply temperature, when the internally generated power supply overheating, the temperature of the relay on the action, so that whole circuit in a warning alarm, and the realization of the power supply overtemperature protection. Temperature relay can be placed in the vicinity of the switching transistor, the general highpower tube shell to allow the maximum temperature is 75 ℃ , adjust the temperature setting to 60 ℃ . When the shell after the temperature exceeds the 桂林电子科技大学毕业设计英文资料翻译 5 allowable value to cut off electrical relay on the switch protection. Semiconductor switching device thermal hot thirstier, in the overtemperature protection, played an important role. It can be used as directed circuit temperature. Under the control of photgate thirstier (TT102) characteristics, by RT value to determine the temperature of the device turnon, RT greater the temperature the lower the turnon. When placed near the power switching transistor or power device, it will be able to play the role of temperature instructions. When the power control the temperature of the shell or the internal device temperature exceeds the allowed value, the heat conduction thirstier on, so that LED warning light. If the opt coupler with, would enable the whole circuit alarm action to protect the switching regulator. It can also be used as a power transistor as the overtemperature protection, crystal switch the base current by ntype gate control thirstier TT201 thermal bypass, cutoff switch to cut off the collector current to prevent overheating. H、 The future development of relay protection Protection technology to future trends is puterized, work, intelligent, protection and control, measurement and data munications integration development. 1) Computerized Along with the rapid development of puter hardware, microputer protection and development in hardware. Former north electricity institute of puter line protection hardware has experienced three development stages: from eight single CPU structure of the microputer relay protection, less than 5 years time to develop more CPU structure, and to develop the large don39。 t bus module, performance greatly improve module structure, widely used. Huazhong university of science and technology development of microputer protection from 8 bits CPU, is the core part in polymerizingkettle development based on 32bit microputer protection. Nanjing institute of electrical automation began a 16bit CPU is developed on the basis of puter line protection, has been widespread in the study, also protect the hardware system 32 bits. The development of southeast university puter hardware and equipment to protect and improve through a lot. Tianjin university is a start with more than 16 bits CPU developed on the basis of puter line protection, which began in 1988 study 32bit digital signal processor (DSP) for the protection and control, measuring devices, microputer integrated with Zhuhai jin electrical automation equipment pany developed into a fully functional 32bit big modules, a module is a small puter. Using 32bit microputer chip is not only because the accuracy and precision of the A/D converter by the resolution limit, more than 16 when converting speed and cost is unacceptable, More important is the 32bit microputer chip with high integrity, high frequency and puting speed and large 桂林电子科技大学毕业设计英文资料翻译 6 space, rich addressing the mand system and more input output. The CPU registers, data bus, the address bus are 32bit memory management function, and memory protection function and tasks, and the conversion function will Cache (Cache) and floatingpoint ponents are integrated in the CPU. 2) Network Power system of microputer protection requirement, besides improving the basic function of protection, also should have the capacity of the fault information and data storage space, longterm fast data processing function, strong munication ability, and other protection and control devices and the whole system by sharing work dispatching data, information and work resources, the ability to program in a highlevel language, etc. This requires microputer protection device is equivalent to a PC. In the early development of puter to protect, once thought to use a small puter finish relay protection device. Due to the large size, then miniputers high cost and reliability of this idea is not reality. Now, with microprocessorbased protection function of similar size, speed, workmanaging machine greatly exceed the storage capacity of miniputer, therefore, make use of the relay protection sets polymerizingkettle time is ripe, this is the development direction of the microputer relay protection. Tianjin University has developed with microprocessorbased protection device with an identical structure reform polymerizingkettle of relay protection device. This device has several advantages: (1) 486PC machine can meet。毕业论文英文翻译---电气工程及自动化精品
相关推荐
标段(林西县统部镇、新林镇) 13 内蒙古统壹测绘有限责任公司 利用地籍测量数据,建设初始地籍数据库。 提供了地籍数据加工 、 属性编辑、拓扑编辑、变更编辑、数据模式检查、统计查询、制图和制表等功能。 完整的图属一体化技术 在本项目中,我公司采用完整的图属一体化技术使地籍成果数据库完全做到图属一 体化,在数据库中,图形与主要属性用同一张表中的同一条记录来描述
第六 ,级别管辖的概念 ,确定级别管辖的标准 .第七 ,中级人民法院管辖哪一类第一审民事案件 .第八 ,最高人民法院管辖哪一类第一审民事案件 .第九 ,地域管辖的概念 ,普通地域管辖实行原告就被告的原则 .第十 ,我国法律对特殊地域管辖做了哪些规定 .第十一 ,什么是专属管辖 .法律对专属管辖做了哪些规定 .第十二 ,裁定管辖分为移送管辖和指定管辖两种 . . 4 楼
料 悬臂,直线连续布料 取料机 桥式,端面取料,中心卸料 桥式,端面取料 绵阳职业技术学院毕业设计 卸料方式 地坑卸料 地面卸料 总投资 100% 126% 有无扩建条件 无 有 通过采用新的工作系统,均化效果 大为提高,设备操作方便,有利于自动控制。 根据工程的具体情况,本设计采用圆形预均化堆场设置。 总堆料量: Q 总 = KQd = 6=( t) 式中: Q 总 —— 堆场内总堆料量, t
成的任务。 统计出用 PLC 控制整个系统所需要的模块和输入、输出点数,用三个 S7- 200 系列 PLC 分别完成对辊道、机械手和堆垛机的控制。 在熟悉了 PLC 的控制原理以后,进入 到本次论文的重点:软件编程,先从局部着手,按照控制系统的三个组成部分,局部进行编程调试,当全部调通以后,再完成入库、出库的自动编程、手动编程以及网络连接编程。 同时要通过 PROFIBUS- DP
ymbian Symbian 系统主要以诺基亚手机为主 , 摩托罗拉和三星等厂商也生产一些 , 但是 量都比较小。 它是一个 32 位的多任务操作系统。 Symbian 的市场占有率现在还是处 于第一的位置。 流行的 Symbian 系统有以下四个版本 ,分别为 S40 ,S60 的第二版、 [5,6] 第三版、第五版。 其中 S60 第五版为触摸屏手机版本。 (2)IPhone OS