麦x锡-topmanagementtrainingjit(编辑修改稿)内容摘要:

e about the system and its losses in order to try to match the final output with the customer requirement. • Typical assumptions: – Fixed demand – Consistent quality – Fixed lead times – Accurate stock levels Work to lists Process A MRP MPS 1 Process A Work to lists 2Work to lists Process 3 listsBOM Inventory Levels Pull system • Pull systems rely on the customer order ‘pulling’ material through the production system as and when it is required. • The system can be thought of as a chain reaction, initiated by the customer withdrawing parts: Supplier Manufacturing site Customer Raw materials Finished goods Pull A shop stock is a controlled, inprocess store that increases the flexibility of the manufacturing process. • The size depends on the reliability and changeover ability of the production process. • It should be located and owned by the preceding process. • It can only be used in a levelled production environment. Shop stocks Pull PI Process FIFO lanes FIFO Pull A FIFO lane is a controlled, inprocess store that increases the flexibility of the manufacturing process • The size depends on the variation in work content across variants in the preceding process Size of FIFO lane = Longest cycle time Shortest cycle time Shortest cycle time • It can only be used in a levelled production environment. Kanban is not a system, but a means of municating customer orders through the manufacturing process. There are three main types of kanban: • Production Instruction kanban – Inprocess kanban – Signal kanban • Parts Withdrawal kanban – Interprocess kanban – Supplier kanban • Tablet kanban Kanban Pull There are three types of Pull System: Types of Pull System Fillup Pull System Used in environments with high frequency of withdrawal . automotive, fast moving consumer goods (fmcg) Sequential Pull System Used in environments with low frequency of withdrawal . generators, ship building Mixed Pull System Used where both high and low frequency of withdrawal occurs . 80% of demand from 10% of variants Pull Fillup Pull Process A PI Process B PI PW PW Dispatch Area Levelling Board Customer • All parts are available in this system (like a supermarket) • Kanbans are used to authorise replenishment and control build sequence • The rate of production is controlled through t。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。